Pieter Desnerck

Pieter Desnerck

Auto-generated profile, based on publicly available information

Pieter Desnerck

Department of Engineering University of Cambridge Cambridge UK

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 April 2010 in Materials and Structures
Verified
Journal Article
Closed access
PDF file
PDPieter Desnerck
Pieter Desnerck
GSGeert De Schutter
Geert De Schutter
LTLuc Taerwe
Luc Taerwe

1 November 2016 in Engineering Structures
Verified
Journal Article
Open access
PDPieter Desnerck
Pieter Desnerck
JLJanet M. Lees
Janet M. Lees
CMChris T. Morley
Chris T. Morley
A reinforced concrete half-joint beam has a complex geometry that includes both a locally disturbed nib region and a full depth section. While this configuration simplifies the design and construction procedures, half joint structures rely on the internal steel reinforcement to transfer force from the nib into the bulk of the beam. When assessing existing reinforced concrete half-joints, engineers can be confronted with internal reinforcement layouts that do not correspond to the as-designed drawings and/or do not comply with current design practice. Bars may be missing or the location, percentage and spacing of the steel reinforcing bars may be non-compliant.To provide a better understanding of the contribution of the internal steel reinforcing bars found in a typical half joint detail, an experimental test program on full-scale half-joint beams was undertaken. Four different scenarios were tested to identify the impact of specific reinforcing bars. A reference specimen was designed in accordance with existing practice. The reference beam, and beams with either missing diagonal reinforcement, missing horizontal reinforcement or a reduced amount of shear reinforcement were tested.All the beams exhibited nib failures with the exception of the beam where the shear reinforcement was reduced. In this case, the failure mode changed from a nib failure to a full-depth failure. The results indicated that if certain bars are missing the overall load bearing capacity of a half-joint could be approximately 40% lower than that of a properly designed detail, but that a redistribution of forces was noted

1 September 2015 in Construction and Building Materials
Verified
Journal Article
Open access
PDPieter Desnerck
Pieter Desnerck
JLJanet M. Lees
Janet M. Lees
CMChris T. Morley
Chris T. Morley
Data supporting the Journal Paper: Desnerck P., Lees M. J., Morley C. (2015) Bond Behaviour of Reinforcing Bars in Cracked Concrete, Construction and Building MaterialsEPSR

1 April 2018 in Engineering Structures
Verified
Journal Article
Open access
PDPieter Desnerck
Pieter Desnerck
JLJanet Lees
Janet Lees
CMChris T. Morley
Chris T. Morley

1 April 2013 in Construction and Building Materials
Verified
Journal Article
Closed access
IPIoan Pop
Ioan Pop
GSGeert De Schutter
Geert De Schutter
PDPieter Desnerck
Pieter Desnerck
TOTraian Onet
Traian Onet

1 March 2013 in Engineering Structures
Verified
Journal Article
Closed access
PHPeter Helincks
Peter Helincks
VBVeerle Boel
Veerle Boel
WCWouter De Corte
Wouter De Corte
GSGeert De Schutter
Geert De Schutter
PDPieter Desnerck
Pieter Desnerck