1 June 1996 in Operations Research
CSChelliah Sriskandarajah
An important class of machine scheduling problems is characterized by a no-wait or blocking production environment, where there is no intermediate buffer between machines. In a no-wait environment, a job must be processed from start to completion, without any interruption either on or between machines. Blocking occurs when a job, having completed processing on a machine, remains on the machine until a downstream machine becomes available for processing. A no-wait or blocking production environment typically arises from characteristics of the processing technology itself, or from the absence of storage capacity between operations of a job. In this review paper, we describe several well-documented applications of no-wait and blocking scheduling models and illustrate some ways in which the increasing use of modern manufacturing methods gives rise to other applications. We review the computational complexity of a wide variety of no-wait and blocking scheduling problems and describe several problems which remain open as to complexity. We study several deterministic flowshop, jobshop, and openshop problems and describe efficient and enumerative algorithms, as well as heuristics and results about their performance. The literature on stochastic no-wait and blocking scheduling problems is also reviewed. Finally, we provide some suggestions for future research directions.
1 August 2003 in Operations Research
Although the supply chain management literature is extensive, the benefits and challenges of coordinated decision making within supply chain scheduling models have not been studied. We consider a variety of scheduling, batching, and delivery problems that arise in an arborescent supply chain where a supplier makes deliveries to several manufacturers, who also make deliveries to customers. The objective is to minimize the overall scheduling and delivery cost, using several classical scheduling objectives. This is achieved by scheduling the jobs and forming them into batches, each of which is delivered to the next downstream stage as a single shipment. For each problem, we either derive an efficient dynamic programming algorithm that minimizes the total cost of the supplier or that of the manufacturer, or we demonstrate that this problem is intractable. The total system cost minimization problem of a supplier and manufacturer who make cooperative decisions is also considered. We demonstrate that cooperation between a supplier and a manufacturer may reduce the total system cost by at least 20%, or 25%, or by up to 100%, depending upon the scheduling objective. Finally, we identify incentives and mechanisms for this cooperation, thereby demonstrating that our work has practical implications for improving the efficiency of supply chains.
1 October 1991 in Operations Research
This paper and its companion (Part II) concern the scheduling of jobs with cost penalties for both early and late completion. In Part I, we consider the problem of minimizing the weighted sum of earliness and tardiness of jobs scheduled on a single processor around a common due date, d. We assume that d is not early enough to constrain the scheduling decision. The weight of a job does not depend on whether the job is early or late, but weights may vary between jobs. We prove that the recognition version of this problem is NP-complete in the ordinary sense. We describe optimality conditions, and present a computationally efficient dynamic programming algorithm. When the weights are bounded by a polynomial function of the number of jobs, a fully polynomial approximation scheme is given. We also describe four special cases for which the problem is polynomially solvable. Part II provides similar results for the unweighted version of this problem, where d is arbitrary.
1 October 1991 in Operations Research
A companion paper (Part I) considers the problem of minimizing the weighted earliness and tardiness of jobs scheduled on a single machine around a common due date, d, which is unrestrictively late. This paper (Part II) considers the problem of minimizing the unweighted earliness and tardiness of jobs, allowing the possibility that d is early enough to constrain the scheduling decision. We describe several optimality conditions. The recognition version of the problem is shown to be NP-complete in the ordinary sense, confirming a well known conjecture. Moreover, this complexity definition is precise, since we describe a dynamic programming algorithm which runs in pseudopolynomial time. This algorithm is also extremely efficient computationally, providing an improvement over earlier procedures, of almost two orders of magnitude in the size of instance that can be solved. Finally, we describe a special case of the problem which is polynomially solvable.
1 December 2001 in Operations Research
The operations research literature provides little guidance about how data should be generated for the computational testing of algorithms or heuristic procedures. We discuss several widely used data generation schemes, and demonstrate that they may introduce biases into computational results. Moreover, such schemes are often not representative of the way data arises in practical situations. We address these deficiencies by describing several principles for data generation and several properties that are desirable in a generation scheme. This enables us to provide specific proposals for the generation of a variety of machine scheduling problems. We present a generation scheme for precedence constraints that achieves a target density which is uniform in the precedence constraint graph. We also present a generation scheme that explicitly considers the correlation of routings in a job shop. We identify several related issues that may influence the design of a data generation scheme. Finally, two case studies illustrate, for specific scheduling problems, how our proposals can be implemented to design a data generation scheme.
1 January 1998 in Annals of Operations Research
CSChelliah Sriskandarajah