Ian Stewart

Ian Stewart

Auto-generated profile, based on publicly available information

Ian Stewart

The University of Manchester, UK

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2022 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
PWPeipei Wang
Peipei Wang
KWKun Wang
Kun Wang
YHYunhan Huang
Yunhan Huang
PFPeter Fenn
Peter Fenn
ISIan Stewart
Ian Stewart
The traditional audit process in construction cost control usually occurs passively at the end of a project life cycle. This calls for a predictive model that provides a framework assembling essential information and predicts construction cost overrun potential during project processes. Unlike previous mechanistic models that reflect the full formation mechanism, the model established in this paper features a fragmentary formation mechanism consisting of shortlisted critical factors. Factors were shortlisted by both theoretical and statistical criticality to construction cost overrun, dictating the factors to pass the initial literature review identification, expert opinion verification, and Pearson’s chi-square tests of interdependence. The factor shortlist was compared with the initial long list identified from the literature to understand the longitudinal trend. The trend manifested in this research necessitated a shift of project management focus from technical difficulties to managerial issues, signaled by the shifting emphasis from contractor planning and control to client monitoring and management and from project difficulties to contract qualities. The shortlisted factors and their interrelationships together formed a fragmentary mechanism and gave the model structure, which was quantified with Bayesian belief network analysis. The model automatically can calculate cost overrun potentials with relevant input and use influence diagrams to find optimal decisions maximizing the expected values of construction cost overrun potential. The predictive model achieved an accuracy rate of 92.4%, which is much higher than that of the comparable model established with the full formation mechanism. This demonstrated that mechanistic models featuring a fragmentary formation mechanism well achieved satisfactory prediction accuracy and efficiency. Therefore, this predictive model provides a framework for project auditors and other relevant project management personnel to monitor project cost proactively throughout the project lifecycle.

4 April 2025 in International Conference on Gender Research
Verified
Journal Article
Open access
PDF file
YWYe Wang
Ye Wang
Elika AminianElika Aminian
Elika Aminian
ISIan Stewart
Ian Stewart
In recent years, the representation of women in the working population has improved. However, despite significant efforts in both academia and industry, the construction sector is still a male-dominated industry both numerically and hierarchically. This is a global issue, and the UK is not an exception. The gender imbalance in the UK construction industry starts with construction education and worsens as women progress in their careers. That is why the concept of the “leaky pipeline” is used in the literature to describe the problem of recruitment and retention of women in the industry. To investigate the barriers contributing to the underrepresentation of women in the UK construction industry, this research systematically reviews the literature from four databases from 1993 to 2023. Industry perception, motivation, environment, skill gap, role models, well-being, organisational support, satisfaction, career development, family responsibilities, and institutionalised inequality were identified as the main barriers for women in joining and progressing in the construction sector. This paper draws upon social cognitive career theory to discuss these barriers, the identified barriers were categorised into four dimensions: contextual influence, self-efficacy, outcome expectations, and goal orientation. In addition, the Super’s career development model was used to map these barriers to the leaky pipeline of women in the construction industry in four stages: exploring (pre-career), establishing (early career), mid-career, and late career. The research finds that industry perception and environment were barriers that prevented women from progressing in pre-career and early career, while family responsibilities were barriers that prevented women from progressing in mid-career and late career. The research provides an overview of the existing studies on barriers contributing to the underrepresentation of women in the construction industry. Also, this study shows that women face different barriers in their career development in the UK construction industry. This suggests that a combination of solutions should be considered to tackle the problem.

14 August 2024 in Management Teaching Review
Verified
Journal Article
Open access
ISIan Stewart
Ian Stewart
This article presents a LEGO® 1 -based experiential exercise where students learn about Tuckman team development and Belbin team role theories. The design allows real-time application of the theories through intense, time-constrained construction activity. Students act in teams of workers or watchers. Workers build the model without the instructions that come with the set. This and a few surprises designed into the task create pressure on the team. Or, students act as watchers, systematically observing the worker teams, using the theories to categorize or predict worker behavior. Directly experiencing the theories helps develop a critique of their utility in helping managers predict and influence team behavior. This activity is intended for synchronous classrooms, ideally with class sizes between 6 and 30. As presented here, the activity requires 2 hours, but can be modified to an hour for a smaller class. Scalability of the task depends on availability of LEGO sets, teaching assistants, and time.

8 March 2026 in Management Teaching Review
Verified
Journal Article
Open access
ISIan Stewart
Ian Stewart
The game was developed for undergraduate business and management programs to teach the fundamental concepts of work organization and job design. Although it was inspired by historical problems in production and the division of labor, the real focus is on organization and managerial action. It can find application in a broad range of management education programs because the game draws from the questions that formed the roots of management education, still relevant today: How do we organize for production? How do we manage the human consequences of this? The debrief process guides students to possible managerial actions to ameliorate the negative consequences of the division of labor. It is frugal, easily scalable, extendable, and customizable to incorporate a broad range of class sizes and management theories. For readers, its implementation could improve their undergraduates’ appreciation of management theory and its relation to managerial action, as they are often without experience of managing or management.

22 November 2025 in Project Leadership and Society
Verified
Journal Article
Open access
FSFangyuan Shen
Fangyuan Shen
ISIan Stewart
Ian Stewart