Zhongming Xiang

Zhongming Xiang

Auto-generated profile, based on publicly available information

Zhongming Xiang

Stantec, Salt Lake City, UT, USA

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2022 in Energy Reports
Verified
Journal Article
Open access
QCQian Chen
Qian Chen
PQPeng Qiu
Peng Qiu
YJYuqi Jin
Yuqi Jin
HXHua Xu
Hua Xu
ZXZhongming Xiang
Zhongming Xiang

13 February 2023 in IEEE Access
Verified
Journal Article
Open access
ZXZhongming Xiang
Zhongming Xiang
GOGe Ou
Ge Ou
ARAbbas Rashidi
Abbas Rashidi
As-built Building Information Models (BIM) are increasingly used to facilitate the management of all aspects of built infrastructure’s life cycle. Existing studies mainly focus on automating as-built BIM development for surface elements but often ignore embedded elements such as rebar due to the inaccessibility with typical sensing devices, such as image-based or time-of-flight-based methods. To tackle the issue, this research innovatively utilizes Ground Penetrating Radar (GPR) and the photogrammetry method together to generate BIMs for in-service buildings considering both surface elements (e.g., column, slab, wall) and rebar. As-built BIM for surface elements is developed at first and rebar is identified by using GPR. A calibration label is designed and attached to elements which are scanned by GPR device, and a series of images are captured from those elements and then used with other images to generate point clouds. Faster RCNN is utilized to recognize labels among all images. Then, an inverse photogrammetry approach is deployed to identify the scanned elements in BIM. By matching the recorded timestamps of GPR data and labeled images, links between the rebar in GPR data and elements in BIMs are successfully developed. Finally, IFC is developed to generate as-built BIM models. Six cases studies demonstrate the system provides a highly automated procedure to develop as-built BIM, and rebars could be efficiently localized and projected into corresponding elements in BIM.

4 August 2022 in International Transactions on Electrical Energy Systems
Verified
Journal Article
Open access
PDF file
ZXZhongming Xiang
Zhongming Xiang
MLMengke Lu
Mengke Lu
CLChengxiang Ling
Chengxiang Ling
TLTianyu Li
Tianyu Li
YWYe Wu
Ye Wu
CZChen Zhang
Chen Zhang
The black-start scheme is of great significance for the rapid recovery of the power system after a blackout. Most of the existing black-start scheme evaluations are studied from the perspective of improving the weight of evaluation indicators and evaluation methods, ignoring differences in the importance of evaluation indicators at different stages of recovery. Therefore, this study proposes a black-start scheme evaluation model based on the evaluation indicator system. First, starting from the elements of the black-start scheme, 14 evaluation indicators for the black-start scheme are proposed, concerning the characteristics of the grid nodes and the different stages of system recovery. Based on the analytic hierarchy process, the evaluation indicators are linked to the evaluation criteria of the system recovery stage to construct an evaluation indicator system for the black-start scheme. Second, the weight of the evaluation indicator is calculated by combining the analytic hierarchy process and the entropy weight method to obtain the result of the subjective and objective combination. Third, this study proposes an evaluation method integrating prospect theory and the multicriteria compromise solution ranking method, by combining the psychological perceived value of decision-makers with the characteristics of black-start schemes, to evaluate and rank black-start schemes. Finally, the rationality and accuracy of the evaluation model proposed in this study are verified by an example of the black-start scheme of Gansu power grid, which could provide a new idea for decision-makers to choose an appropriate black-start scheme.