4 July 2019 in Nuclear Fusion
4 February 2020 in IEEE Transactions on Applied Superconductivity
QST, as Japan Domestic Agency in ITER, has responsibility to procure 9 ITER Toroidal Field (TF) coils and all 19 TF Coil Cases (CC). The 9 TF coils are procured by two suppliers to ac-celerate their production. The series production of Double-Pancakes (DPs) and Winding Pack (WP) are in progress in both two manufacturing lines. 55 DP windings, 40 DP impregnation and curing, 3 WPs and 7 CCs have been completed. Series pro-duction of TF coil WP and CC are progressing in Japan. The as-sembly of WP and CC is proceeding and gap-filling impregna-tion was completed in the first TF coil. Since the remaining pro-cess in the first TF coil is only final machining, we can say that the procedure of ITER TF coil fabrication have been well devel-oped and established.
19 December 2017 in IEEE Transactions on Applied Superconductivity
National Institutes for Quantum and Radiological Science and Technology (QST), which has been Japan Atomic Energy Agency up to March 2016, as Japan Domestic Agency (JADA), has responsibility to procure 19 coil cases for ITER Toroidal Field Coils (TFCs) as in-kind components. The TFC case (TFCC) is a large structure having a D-shape with a height of 16.5 m, a width of 9 m, and a weight of about 200 tons., Because TFCC is a large welded structure, severe dimensional tolerance is required, such as a +/-2.0mm profile. In order to minimize the technical risk during manufacture of the TFCCs, QST has performed trials to establish manufacturing procedures before commencement of the actual manufacturing. After the establishment of manufacturing procedures, QST began the manufacture of the first TFCC in August 2012. In parallel with actual manufacturing processes, some trials have been conducted to rationalize some manufacturing processes, while establishing others. Finally, the first unit of TFCC is scheduled to arrive at Coil assembly at the end of 2017.
8 October 2021 in Nuclear Fusion
The first ITER toroidal field coil (TFC) has been successfully manufactured by the Japanese Domestic Agency in January 2020. The ITER TFCs are the largest Niobium Tin (Nb3Sn) superconducting magnets in the world; each is enclosed in an austenitic stainless-steel case with a height of 16.5 m and total weight is 310 tons (Knaster et al 2008 IEEE Trans. Appl. Supercond. 18 495–498). A set of 18 TFCs will be installed around vacuum vessel to function as a plasma confinement magnet system. The responsibility to procure 18 TFCs and 1 spare coil is shared between European Domestic Agency and Japanese Domestic Agency (Bellesia et al 2020 IEEE Trans. Appl. Supercond. 30 4202205; Sborchia et al 2008 IEEE Trans. Appl. Supercond. 18 463–466). To hold a common magnetic and geometrical properties among all the TFCs, tight tolerances of sub-millimeter order are defined on each TFC. The fabrication of those massive magnets with such tight tolerances involved some major technical challenges. These technical challenges were solved by pre-assessment and process qualification through some qualification trials. As a result, techniques established to solve those challenges were implemented to the TFC manufacturing, leading to the successful completion of the first TFC. The details are described in the paper.
4 February 2019 in IEEE Transactions on Applied Superconductivity
QST, as Japan Domestic Agency in ITER, has responsibility to procure 9 ITER Toroidal Field (TF) coils and all 19 TF Coil Cases (CC). The 9 TF coils are procured by two suppliers to accelerate their production. The series production of Double-Pancakes (DPs) and Winding Pack (WP) are in progress in both two manufacturing lines. 45 DP windings, 30 DP impregnation and curing, and the first WP cold test and the second WP impregnation have been completed. In addition, 4 CC have been completed. Assembly of the WP and CC of the first TF coil will start from beginning of 2019. To qualify assembly of the WP and CC, trials including those to estimate closure welding deformation and qualification of tooling have been performed. The assembly procedure has been developed based on these results.
20 January 2006 in Fusion Engineering and Design