6 November 2022 in IET Generation, Transmission & Distribution
Low‐Voltage (LV) distribution grids are facing a rapid increase of connected Photovoltaic (PV) power plants as well as flexible consumers like Battery‐Electric Vehicle (BEV) chargers and Heat Pumps (HPs). The coordinated operation of these generation, storage and consumption units, referred to as Distributed Energy Resources (DERs), is regarded as a key requirement to maximize the benefits of renewable generation without violating, for example, voltage limits. Therefore, an operation management scheme was proposed in previous work that optimizes the power flows in LV grids in real‐time, where optimality is expressed as a maximization of the utility that DER owners experience from power consumption or injection, respectively. In this contribution, this method is extended by: (1) detailing a time‐varying utility‐model to express customer needs, (2) introducing a distributed implementation enhancing the robustness to failures, (3) developing a testbed using a real‐time digital power grid simulator and a communication network emulator, and (4) integrating a real‐time information flooding protocol. The performance is evaluated in different simulation scenarios, showing that the proposed method is able to cooperatively utilize the flexible units in order to fulfil the DER owners' needs even in the event of controller failures and constrained communication.
17 September 2021 in e+i Elektrotechnik und Informationstechnik
We present an operation management controller for low voltage (LV) grids that coordinates a multitude of distributed energy resources (DER) in real time to maximize the utilization of renewable energy production. It utilizes an LTE radio network that connects the DERs to the distribution system operator. In our approach, utility functions are assigned to the DERs, and the utility maximization is formulated as an optimization problem. The optimization problem is solved by an iterative algorithm that performs incremental updates of the DER power set values to achieve the optimum. In order to take the state of the grid in the optimization process into account, the state of the grid is estimated. During the simulation of a use case, we demonstrate the applicability and identify the benefits of our approach compared to an established optimal power flow (OPF) method. Particular emphasis is put on evaluating the communication delay and feasibility of the required communication network, as the iterative approach leads to a high communication load.