Distributed generation (DG) is expected to improve the system reliability as its backup generation. However, DG contribution in fault current may cause the loss of the existing protection coordination, e.g. recloser-fuse coordination and breaker-breaker coordination. This problem can drastically deteriorate the system reliability, and it is more serious and complicated when there are several DG sources in the system. Hence, the above conflict in reliability aspect unavoidably needs a detailed investigation before the installation or enhancement of DG is done. The model of composite DG fault current is proposed to find the threshold that existing protection coordination is lost. Cases of protection miscoordination are described, together with their consequences. In addition, the issues of on-site DG and tie line are studied. Reliability indices are evaluated and compared in the distribution reliability test system RBTS Bus 2
29 July 2013 in IEEJ Transactions on Electrical and Electronic Engineering
In order to utilize a 211At isotope, a promising α-emitter for radionuclide therapy, the chemical properties of astatine isotopes are studied. We have examined wet chemistry methods through the distribution ratios of astatine in liquid–liquid extraction. The astatine isotopes have been found to be well extracted into DIPE and MIBK. We observed that the distribution ratio of astatine isotopes increases with concentrations of HCl greater than 3 M, while it decreases with the HCl concentration less than 2 M. The results will be useful for development of the 211Rn–211At generator.