Ossama M. Salem

Ossama M. Salem

Auto-generated profile, based on publicly available information

Ossama M. Salem

Professor, Civil and Environmental Engineering, Yabroudi Chair of Sustainable Civil Infrastructures, 151 Link Hall, Syracuse Univ., Syracuse, NY

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2012 in Journal of Infrastructure Systems
Verified
Journal Article
Closed access
BSBaris Salman
Baris Salman
OSOssama Salem
Ossama Salem
Wastewater utilities are aiming to implement asset management strategies to minimize costly emergency repairs, to justify expenditures, and to optimize future renewal actions. Consequently, development of deterioration models that explain the behavior of wastewater lines and provide predictions regarding potential future condition levels is gaining importance. In this paper, deterioration models are generated to estimate the probability of failure values for sewer sections. A set of variables was obtained by examining the inventory and inspection databases of a sewer network. Three statistical methods (ordinal regression, multinomial logistic regression, and binary logistic regression) were employed in successive steps. Proportionality of odds assumption was tested for ordinal regression models, and suitability of this particular method was discussed. Estimated condition ratings were compared with observed data, and the binary logistic regression model was found to be more suitable for predicting ...

1 August 2012 in Journal of Pipeline Systems Engineering and Practice
Verified
Journal Article
Closed access
BSBaris Salman
Baris Salman
OSOssama Salem
Ossama Salem
Because of deteriorating condition levels of wastewater networks and financial constraints, sewer agencies are seeking methods to prioritize inspection of sewer pipes on the basis of risk of failure. Risk assessment of sewer pipes requires integration of the probability and consequences-of-failure values in a way that reflects the decision maker’s perception of risk. This paper presents the use of a weighted scoring method to determine criticality of sewer pipelines. The procedure involves identifying important factors, determining the relative importance of the selected factors, and summarizing the overall performance of sewer pipes in terms of these factors. Determination of risk of failure by combining the resultant consequence-of-failure values with the probability-of-failure values using simple multiplication, risk matrices, and fuzzy inference systems is presented. Application of these methods is illustrated by using the sewer network information obtained from a local wastewater agency. The ...

1 June 2012 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
ADAbhijeet S. Deshpande
Abhijeet S. Deshpande
OSOssama M. Salem
Ossama M. Salem
RMRichard A. Miller
Richard A. Miller
A fast-track project delivery strategy is designed to leverage the ability to execute the design, procurement, and construction phases simultaneously to substantially reduce the overall project duration. The successful execution of the design phase in fast-track projects is especially challenging because the concurrent execution of design and construction interferes with the inherently iterative nature of the design process. In this research, it was hypothesized that a correlation exists between the use of some of the Construction Industry Institute (CII) best practices and the performance of design phase in fast-track projects. Analysis of the performance of the design phase in 31 fast-track projects revealed a statistically significant correlation between performance of the design phase and front-end planning, alignment, constructability, and change management. The results of quantitative analysis are supported by qualitative analysis of data, opinion of experts from industry, and academia. The projects analyzed in the study were executed by CII member companies with experience and knowledge of using the best practices effectively.

1 April 2012 in Journal of Management in Engineering
Verified
Journal Article
Closed access
ADAbhijeet S. Deshpande
Abhijeet S. Deshpande
LFLarry E. Filson
Larry E. Filson
OSOssama M. Salem
Ossama M. Salem
RMRichard A. Miller
Richard A. Miller
Lean production techniques developed by Toyota Motor Corporation have been widely applied in the manufacturing sector to reduce waste, ensure just-in-time delivery, create effective value streams, and ensure continuous improvement. Over the last two decades, significant efforts have been made to develop the theoretical foundation and practical tools to implement these techniques in the construction process. The construction process is similar to production, in that it involves the assembly of raw materials into a product. The design process, on the other hand, involves conversion of the client’s requirements into manufacturing instructions using creativity and technical knowledge. This makes it challenging to implement the principles of lean production directly to design. This technical note presents the techniques used by a midsize industrial construction contractor: purpose built facility, making decisions at the last responsible moment, lean audits, and 5S in the design of industrial projects to encapsulate and implement techniques of lean production in the management of design.


7 July 2016
Verified
Conference Paper
Open access
PDF file
HAHossein Ataei
Hossein Ataei
OSOssama M. Salem
Ossama M. Salem
In New York. As a registered Professional Engineer both in Canada and in the United States, he has the industry experience in the fields of structural design of civil infrastructure systems; business administration of heavy civil projects and project controls of large-scale civil infrastructure for global Engineering-Procurement and Construction firms. He has also been involved in project management consulting and risk advisory services for construction and infrastructure projects. He is a licensed Professional Engineer (P.E.) in Nevada, Ontario and Quebec. He has a Ph.D., Civil Engineering, from University of Southern California in Los Angeles, California; A Master of Business Administration (M.B.A.) from Concordia University in Montreal, Canada as well as a Master of Construction Management (M.C.M.