Interest in Demand Response (DR) is increasing due to its potential to improve reliability and save costs for electricity systems. DR can provide a sustainable and cost-effective option for supply balancing, especially in a scenario with more volatile inflows from renewable energy sources. End-users can be incentivized to provide DR through time-based pricing in general and dynamic pricing in particular. This paper provides a theoretic framework and practice-oriented review of the status of DR in Europe, outlining the major challenges currently hampering further DR development. Important challenges involve the split-incentive issue for investments in enabling technologies, traditional market rules for flexibility that favor large generation units and the need for electricity market and network operation coordination
In the course of its first (2005-2007) and part of its second (2008-2010) trading periods the EU ETS has revealed insufficient tightness and some inefficiencies in the allocation mechanisms used. Recent amendments to the Emissions Trading Directive will start applying after 2013, such as a reinforced EU-wide emission cap and the end of free allowances for the power sector. Even under stricter rules, there is some uncertainty about the effectiveness of the EU ETS to reduce emissions from power generation in the near future with the available technologies. This paper studies the impact of different CO 2 price scenarios on the operation of the European power system in 2015 for a given generation portfolio. A mid-term planning model assuming perfect competition and market splitting between countries is used. Results show how CO 2 price impacts are limited to bring on emission reductions due to the existing technologies and cross-border transmission capacities.
In order to comply with the European Union's ambitious renewable targets for 2020, extensive investments in wind generation capacity have been made. Wind power plants are located primarily where the resource is available, which can lead to local transmission constraints during certain periods. In order to avoid transmission congestions, short-term measures that increase system operation costs such as topological maneuvers, conventional generation redispatch and wind curtailment are taken by the system operator. In this context, this paper performs a cost-benefit analysis of the installation of a Flexible AC Transmission Systems (FACTS) device to avoid transmission congestions in a Spanish area dominated by wind generation contributing to a more efficient integration of wind power. Furthermore, it is computed the additional wind power that could be integrated with the installation of this device.