31 December 2011 in Acta Structilia 23(2)
Small and Medium-size Enterprises (SMEs) fulfil an important role in the long-term growth and development of the economy of the country. The development and growth of construction SMEs are important for all countries, as a strong SME base has the capacity to produce a high-quality infrastructure for the country. However, research has revealed the high failure rate of small businesses within the first five years of their existence in South Africa. In addition, research also indicated that lack of long-term planning and lack of strategic thinking are major contributing factors to the failure of most SMEs. For instance, despite the considerable growth in the industry in the past decade due to government’s considerable infrastructural spending occasioned by the 2010 FIFA World Cup, the majority of construction SMEs failed to use the opportunities gained in this period to develop into established construction entities. This study investigates how strategic management can be applied to address the problems faced by construction SMEs, and to explore techniques and tools of strategic management that can make a significant contribution to their growth and development. The research findings, based on a literature review and a qualitative research approach, suggest that, although many construction SMEs perform poorly, some have the potential to grow and develop into more established entities by proactively managing their firms strategically. In addition, the findings indicate that SMEs that practise strategic management perform better, and that there are many advantages for SMEs that adopt strategic management principles at the organisational level.
31 July 2022 in International Journal of Construction Supply Chain Management
In the South African government sector, public procurement is a strategic mechanism through which the government could be able to achieve the mandatory socioeconomic objectives. To this extent, the government procures goods and services from the private sector which can be estimated around eight hundred billion rand annually. Although there are numerous policy frameworks and systems to ensure that the management of the public procurement processes are fair, equitable, transparent, and cost-effective; the public procurement management practice, particularly in the delivery of construction goods and services, remains vulnerable to mismanagement and irregularities. To this extent, the nature of the irregularities and the stages at which they occur in the public procurement system remains unclear. To address this gap of knowledge, a content analysis method and the associated techniques of in-Vivo coding and word frequency analysis were used for the analysis of the secondary data. The study revealed that poor and or non-performance were the most frequent irregularities in the procurement of public construction services. The principal theoretical implication of this study is that rigorous proficiency measures should be applied to scrutinize and evaluate the potential of the contractors in terms of capacity to deliver in accordance with the contractual agreements prior to the awarding of contracts.
26 December 2022 in Critical Housing Analysis
The adoption of innovative building technologies (IBTs) and social welfare policies in South Africa has facilitated an increase in decent homeownership among low-income groups, thus improving their quality of life. However, due to the escalating costs of building materials, the capital and lifecycle costs of implementing these technologies may no longer be affordable. This research aims to provide a comparative evaluation of the affordability of some readily available IBTs in the South African construction industry, relative to existing homeownership subsidy grants. The method used involved the use of secondary data for these IBTs and the income constraint methods. The results showed that, apart from the technologies suitable for the provision of temporary structures, most of the other technologies were not affordable for the complete subsidisation of the top structure when both capital and lifecycle costs were used, except the Moladi and Robust structure IBTs under some low-income homeownership programmes. Further analysis using credit-linked subsidies revealed that the minimum household income required to achieve affordable homeownership (and their rankings) depends both on the evaluation technique (lifecycle or capital costs) and technology used. To improve affordability, any implementing government can either raise the amount of the top structure subsidy grant, promote the use of cheaper but durable IBTs, or promote the use in incremental building methods, such as the Enhanced People’s Housing Process (EPHP) for the case of South Africa.