The condition of the existing sewerage system, the mean value and extremes of hydraulic loads for dry and rainy weather, organic load and key parameters of wastewater quality are determined based on the analysis of the collected technical documentation related to the existing sewerage system, statistical data on the number of inhabitants connected to the sewerage system, questionnaires filled out by the public utility company and industrial enterprises, the results of flow measurements and sampling of wastewater and testing of its physico-chemical characteristics. The algorithm for calculating the input parameters relevant for the dimensioning of the future plant is then selected depending on the condition of the sewerage system and the planned reconstructions and extensions, demographic, as well as projections of economic development.
The ratio of concentrations of total nitrogen and five-day biochemical oxygen demand in the sanitary wastewater of an energy infrastructure facility in Serbia is many times higher than usual, resulting in only half of the total nitrogen being eliminated in wastewater treatment plants (membrane bioreactor with anoxic and aerobic reactors) by denitrification. The first step of analysis was mathematical modelling of the composition and origins of the input wastewater. The model was developed based on the scientific literature data on composition of human excrement and the data on composition of water used for sanitary purposes. Next, it was successfully verified by comparisons to the experimental data of the wastewater composition. In the next step, a model for wastewater treatment simulation was created by using the BioWin software (Envirosim Associates, USA) in order to examine functioning of the plant and test the effects of several possible modifications of the process. A good agreement with the qualities of the influent and effluent determined by laboratory analyses was achieved after model calibration. The results of simulations showed a tenfold decrease in the total nitrogen concentration and a fortyfold decrease in the total phosphorous concentration in the effluent after introducing the following modifications to the simulated process: ferric chloride dosing, increasing dosing of acetate in the anoxic reactor by a factor of seven, increasing of the waste activated sludge rate by a factor of four and increasing the recirculation flow rate by a factor of three.
The results of two flow, sampling and laboratory analysis campaigns of wastewater indicated their high dilution by the intensive inflow of foreign water into the fecal sewage system, which is a major problem for the functioning of the future wastewater treatment plant, which would have to be significantly oversized. A two-day field testing campaign was carried out, which included inspection of manholes, Measurements of flow, electrical conductivity and temperature of water to determine whether there is an inflow of surface water or infiltration of groundwater, and to find the points and/or zones of the most intense inflow of foreign water. The site of the inflow of the previously unregistered stream was found and possible solutions to the problem were defined.