Carl Cormany

Carl Cormany

Auto-generated profile, based on publicly available information

Carl Cormany

ITER Organization, St. Paul Lez durance Cedex, France

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 January 2020 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
TSThierry Schild
Thierry Schild
PLPaul Libeyre
Paul Libeyre
ABAndrew Bruton
Andrew Bruton
CCCarl Cormany
Carl Cormany
EGEnrique Gaxiola
Enrique Gaxiola
CDClement Nguyen Thanh Dao
Clement Nguyen Thanh Dao
The Central Solenoid (CS) is a key element of the ITER Magnet system, including six identical coils, called modules, assembled together to form a 4 m outer diameter, 13 m high solenoid. It is a superconducting magnet, using a 45 kA Nb3Sn conductor internally cooled by circulation of supercritical helium at 4.5 K with a peak field up to 13 T. It is enclosed inside a structure providing vertical pre-com-pression and mechanical support. Procurement of the com-ponents and the special assembly tooling of the ITER CS is the responsibility of US ITER, the ITER Domestic Agency of the USA, while the ITER Organization (IO) will carry out the assembly of these components. US ITER has awarded several contracts since 2011 to supply seven modules, including a spare, structure compo-nents, and the special tooling required for the CS pre-as-sembly. All deliveries are scheduled with the objective to start the CS assembly at IO site early 2021. IO is now ac-tively preparing this new phase. This paper describes the general CS pre-assembly activi-ties from modules stacking to the pre-compression at 210 MN. The special assembly processes and related tooling are detailed. A focus is given on the module lifting opera-tion, the extensions assembly and the pre-compression. For these last two processes, IO has investigated alterna-tive assembly options that will be presented.

13 December 2017 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
YIYuri Ilyin
Yuri Ilyin
FSFabrice Simon
Fabrice Simon
QHQing Hua
Qing Hua
ABAndrei Baikalov
Andrei Baikalov
CGChen-Yu Gung
Chen-Yu Gung
NMNeil Mitchell
Neil Mitchell
The superconducting coils of the ITER magnet system have hundreds of electrical lap joints interconnecting superconducting cables. The joints operate in a magnetic field of up to 4 T, field derivatives of 0.5 T/s, and currents up to 70 kA. The acceptance tests for the toroidal field (TF), poloidal field (PF), and correction coil (CC) coils will be performed at 77 K, before they are assembled in the pit. Hence there will be no possibility to measure the resistance of the joints in the superconducting state before the whole magnet system is enclosed in the Tokamak cryostat. In addition, no reliable nondestructive method has been found to spot the joints with a failure at room temperature. Therefore, the production of the joints relies on the strict adhesion to established robust manufacturing procedures during the qualification phase. As additional quality monitoring, a periodic test of the joint samples manufactured in parallel with a coil fabrication is foreseen to control the reproducibility of the joint electrical performance. In order to qualify the manufacturing procedures, to establish a series production tools and worker teams, a comprehensive qualification program has been set up for manufacturers of the coils in Russia (Poloidal Coil 1, PF1), China (PF6, feeders, CC), Japan (TF), Europe (TF and PF), and USA (Central Solenoid, CS). This program includes a set of mockups manufactured according to the process to be used for the coils and submitted to different tests. They include mechanical testing of materials, electrical tests of full size joint samples, destructive microscopic examination of the joint mockups, and mechanical testing of the full size joint mockups. All tests are carried out in specialized laboratories qualified for this type of work. This paper describes the main items of the qualification program, the tests performed, and the acceptance criteria. The test results are reported and compared to the criteria.

5 March 2024 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
YMY. Miyoshi
Y. Miyoshi
ABA. Bruton
A. Bruton
CCC. Cormany
C. Cormany
MLM. Liao
M. Liao
NMN. Mitchell
N. Mitchell
JSJ. Smith
J. Smith
Central Solenoid (CS) components have an abundance of technical challenges ranging from material science to component interfacing. In manufacturing, a CS module is subjected to stringent high voltage insulation strength tests at multiple occasions. The engineering challenge is where a multitude of quench detection wires need to exit the bulk insulation and the materials boundary or compatibility become an issue. In assembly, each CS module terminals is jumped to its respective feeder line via an extension lead that is manufactured with interfacing constraints with the module terminal vector as well as the feeder terminal mating surface. Another critical aspect is the clearance available in assembly with other surrounding tokamak components. A summary of the issues found in manufacturing of large scale structural components is also given.

29 January 2024 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
CCC. Cormany
C. Cormany
ABA. Bruton
A. Bruton
MLM. Liao
M. Liao
NMN. Mitchell
N. Mitchell
YMY. Miyoshi
Y. Miyoshi
JSJ. Smith
J. Smith
This paper describes critical assembly process qualifications, acceptance criteria, and worker training of ITER Central Solenoid Assembly. Coaxial joint assembly was qualified and trained to achieve resistance below 4.1 nOhm. The electrical insulation process was qualified to 30 kV and 15 kV under Paschen conditions. Shear pin drilling and installation within specified tolerance was achieved. Modules were lifted and positioned within 2 mm. The lessons learned, and subsequent work execution onsite within the IO facility assembly hall are also presented.

24 November 2025 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
YMY. Miyoshi
Y. Miyoshi
ABA. Bruton
A. Bruton
CCC. Cormany
C. Cormany
TST. Schild
T. Schild
IRI. Rodin
I. Rodin
JSJ. Smith
J. Smith
ITER Central Solenoid (CS) system manufacturing, after ten years, completed all coil modules manufacturing and testing to full current 40 kA at 4.5 K. Meanwhile the assembly work at ITER has progressed steadily since its start five years ago. A summary of characteristic technical challenges found in manufacturing and assembly, and an outlook of what is expected towards the completion of CS assembly are presented.

15 January 2024 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
TJTao Jiang
Tao Jiang
TCTong Che
Tong Che
LSLianli Shao
Lianli Shao
HZHaiyu Zhu
Haiyu Zhu
PWPeng Wang
Peng Wang
LYLuxu Yang
Luxu Yang
The installation process of the Central Solenoid (CS) on the ITER site is a complex and multi-step process that involves careful planning, engineering, and construction. The CS occupies the bore of the ITER tokomak and provides a dynamic magnetic field which inductively drives the plasma current. The CS assembly consists of a stack of six modules each electrically connected to bus bars and mechanically bonded with an external structure as shown in (Fig. 1 ). Each module is connected to its bus bar with a pair of coaxial joints. This document will provide a brief overview of the recent installation progress, and then will focus on several critical steps of one module stacking, such as lifting and joint assembly.