Yongqiang Duan

Yongqiang Duan

Auto-generated profile, based on publicly available information

Yongqiang Duan

University of Chinese Academy of Sciences, Beijing 100049, China and Key Laboratory of Microwave Remote Sensing, National Space Science Center, Chinese Academy of Sciences, Beijing 100190, China

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 January 2020 in IEEE Transactions on Instrumentation and Measurement
Verified
Journal Article
Closed access
YDYongqiang Duan
Yongqiang Duan
4W4367420011110904057 Wang
4367420011110904057 Wang
YXYuwei Xiao
Yuwei Xiao
WWWenyu Wang
Wenyu Wang
Microwave humidity and temperature sounder (MWHTS) is an important payload of FENGYUN-3D (FY-3D) satellite. MWHTS is designed as total power radiometer because of its high radiometric resolution (NEDT) and simple configuration. NEDT is one of the most important indicators for MWHTS. However, the traditional NEDT analysis results have a large error compared with the measured results. To estimate the overall radiometer performance, this paper presents a numerical system simulation model that can be used to estimate NEDT. The model considers two of three main components that degrade the NEDT: thermal noise and calibration error. The third components 1/f noise is calculated by analyzing the power spectrum of the actual output voltage. Based on digital signal processing, this paper presents a method for accurate system modeling, including radiation source modeling, frontend modeling and backend modeling. The simulation model is validated by comparing the dynamic range, linearity and standard deviation of output signals of simulation system and actual instrument. In this paper, the model has been applied to NEDT estimate of 15 MWHTS channels operating from 89 GHz to 183 GHz. The comparison of estimate results between simulation model and actual instrument shows they are in good agreement and the maximum error is no more than 18%.