Celso K. Morooka

Celso K. Morooka

Auto-generated profile, based on publicly available information

Celso K. Morooka

University of Campinas

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2005 in Journal of the Brazilian Society of Mechanical Sciences and Engineering
Verified
Journal Article
Open access
PDF file
MYMarcio Yamamoto
Marcio Yamamoto
CMC. K. Morooka
C. K. Morooka
The purpose of this paper is the study of fuzzy control applied to a Dynamic Positioning System (DPS) of semi-submersible platforms. A numerical simulator program in time domain was coded using mathematical models of the floating platform dynamics and the external forces (wind, current, wave and thruster) that act on the platform. Subsequently, a fuzzy controller applied to DPS was developed. The Fuzzy controller and the Proportional-Integral-Derivative (PID) controller were then subjected to the same environmental conditions in order to compare their performance

1 June 2011 in Marine Systems & Ocean Technology
Verified
Journal Article
Closed access
PDF file
CMCelso K. Morooka
Celso K. Morooka
RTRaphael I. Tsukada
Raphael I. Tsukada

1 January 2007
Verified
Conference Paper
Closed access
PDF file
MYMarcio Yamamoto
Marcio Yamamoto
CMCelso K. Morooka
Celso K. Morooka
SUSeiya Ueno
Seiya Ueno
The present study deals with the dynamics of a semi-submersible platform coupled with a free-hanging vertical rigid riser during the re-entry operation in ultra-deep water. The reentry operation occurs after the drilling phases are accomplished which only use the bare drillstring. The re-entry operation entails positioning the subsurface Blow-Out-Preventer (BOP) above the wellhead and installing it to the wellhead. During this operation, the BOP is suspended by the drilling riser. The placement and installation is time consuming and requires a great amount of accuracy. One challenge is the effects of platform motions on the installation procedure. The present work was carried out with the aim to understand the influence of platform motions during the re-entry operation in ultra-deep waters. Another benefit of this study is the knowledge of the effect of platform motions on the drilling riser and BOP which leads to the possibility of drilling more than one well without the need to raise the BOP to the surface. This could greatly reduce the amount of time needed to drill subsurface wells which in turn, reduces overall operational costs. A numerical simulation in time domain has been carried out using a non-linear model for the platform dynamics. The dynamics of a free hanging drilling riser and a dynamic positioning system (DPS) of the semi-submersible platform are included in the numerical model. Simulation results in time domain of the platform displacements with DPS and riser displacement are shown. A discussion of riser displacement and DPS control is also included.

1 June 2013 in Marine Systems & Ocean Technology
Verified
Journal Article
Closed access
PDF file
CMCelso K. Morooka
Celso K. Morooka
RTRaphael I. Tsukada
Raphael I. Tsukada

1 December 2013 in Marine Systems & Ocean Technology
Verified
Journal Article
Closed access
PDF file
RTRaphael I. Tsukada
Raphael I. Tsukada
CMCelso K. Morooka
Celso K. Morooka