Xiao Chen

Xiao Chen

Auto-generated profile, based on publicly available information

Xiao Chen

School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan, China

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2022 in Journal of Hydrology
Verified
Journal Article
Closed access
BJBenjun Jia
Benjun Jia
JZJianzhong Zhou
Jianzhong Zhou
ZTZhengyang Tang
Zhengyang Tang
ZXZhanxing Xu
Zhanxing Xu
XCXiao Chen
Xiao Chen
WFWei Fang
Wei Fang

1 July 2020 in IEEE Access
Verified
Journal Article
Open access
XCXiao Chen
Xiao Chen
JZJianzhong Zhou
Jianzhong Zhou
BJBenjun Jia
Benjun Jia
XYXin Yang
Xin Yang
CZChao Zhou
Chao Zhou
The characterization of the mapping relationship (MR) between outflow of the upstream reservoir (OUR) and inflow of the downstream reservoir (IDR) in the short-term generation dispatching of cascade reservoirs (SGDCR) greatly impacts the safe and economic operation of hydropower plants. If this MR is not characterized properly, the operation process of hydropower stations will deviate from the planning dispatching schemes. Especially when the upstream reservoir (UR) undertakes peak load regulation tasks frequently and the downstream reservoir (DR) owns weak re-regulation capacity, the safety of cascade reservoirs will be seriously threatened. In this extreme system, the commonest characterizing models in SGDCR, such as the lag time (LT) model and the Muskingum model, may cause a huge deviation when simulating or forecasting the IDR. Given this dilemma, the Gaussian process regression (GPR) model, which is a representative for Bayesian regression methods, is firstly introduced to handle this MR and compared with the LT and the Muskingum model in this paper. The Three Gorges-Gezhouba cascade reservoirs (TGGCR) in China are selected as a typical case study. The performance indicators of four categories are adopted to evaluate the simulated IDR in a single period and a set of pivotal indicators are proposed to estimate the simulation dispatching in multiple periods. The results show that (1) The GPR model reduces the mean absolute deviation (MAD) about inflow of Gezhouba by 197m3/s and 263m3/s than the LT and the Muskingum model respectively; (2) The distribution characteristics of inflow deviation produced by the GPR model are most competitive. Meanwhile, the GPR model has the strongest ability when conducting the multi-period simulation dispatching and owns best applicability on the whole range of streamflow. (3) The Muskingum model is not recommended to characterize the hour-scale hydraulic connection in the extreme system of SGDCR.

8 November 2021 in IEEE Access
Verified
Journal Article
Open access
XCXiao Chen
Xiao Chen
JZJianzhong Zhou
Jianzhong Zhou
BJBenjun Jia
Benjun Jia
Large hydropower stations often undertake peak regulation tasks during the non-abandoning water season. This requires a reasonable arrangement of unit commitment and load distribution (UCLD). In this study, a load distribution model considering constraints of substations was established, and a novel refined and practical method (RPM) was proposed by considering a whole plant-substation module, substation-unit module, and adjustment module along with practical strategies. The Three Gorges hydropower station in China was selected to demonstrate the effects of the RPM. The results showed that the RPM with high calculation timeliness can obtain UCLD schemes with high rationality and practicability under the constraints of the whole plant, substations, and units. The relative mean absolute error of the simulation outflow could be controlled within 1%, thereby providing a valuable reference for forecasting the outflow process which involving the unit level.