Luis Fernando Enriquez-Contreras

Luis Fernando Enriquez-Contreras

Auto-generated profile, based on publicly available information

Luis Fernando Enriquez-Contreras

Department of Electrical and Computer Engineering, University of California, Riverside, CA

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 November 2025 in Transportation Research Record: Journal of the Transportation Research Board
Verified
Journal Article
Open access
LELuis Fernando Enriquez-Contreras
Luis Fernando Enriquez-Contreras
DPDongbo Peng
Dongbo Peng
RYRuili Yao
Ruili Yao
MBMatthew Barth
Matthew Barth
KBKanok Boriboonsomsin
Kanok Boriboonsomsin
This paper presents an integrated approach to optimizing microgrid management and electric truck logistics for transportation research. The experiment involves a 100 kW solar photovoltaic system, a 500 kWh battery energy storage system, the electric demand of a commercial building, and a heavy-duty vehicle charging system. The study aims to demonstrate how synchronized optimization of a microgrid control algorithm and a truck route algorithm can reduce overall system costs. The microgrid management system is designed to meet the constraints and requirements of a commercial electric truck charging scheduler. This integrated approach is an improvement over previous systems as it uses the scheduler’s outputs—such as time frames and energy requirements—as constraints for microgrid management. The truck scheduling algorithm iteratively learned to optimize charging times, ensuring that charging occurs during low-cost periods or when renewable energy is available. The electric vehicle scheduler adjusted truck arrival times based on the availability of clean energy sources, creating a feedback loop that continuously improves cost efficiency. Results indicated significant cost savings, with electric utility costs for electric vehicle (EV) charging being only 0% to 20% of the original value while the transportation system is only 23% to 64%, compared with the baseline scenario without the co-optimization framework. These findings suggest that the proposed integrated approach can effectively reduce costs and improve the efficiency of microgrid and electric truck operations. Uncoordinated charging schedules leads to a higher power demand than a well-organized battery electric truck (BET) dispatching strategy. Optimizing truck charging times and energy needs based on microgrid conditions can significantly reduce electricity and transportation costs.

18 October 2021
Verified
Conference Paper
Closed access
AHA S M Jahid Hasan
A S M Jahid Hasan
JYJubair Yusuf
Jubair Yusuf
LELuisFernando Enriquez-Contreras
LuisFernando Enriquez-Contreras
SUSadrul Ula
Sadrul Ula
High penetration of renewable integration with the grid has invoked the necessity for battery energy storage applications. This has been further escalated by technology advances and descending costs. Utility-Scale Battery Energy Storage Systems (BESS) are being deployed worldwide in numerous projects due to their ability to provide grid ancillary services such as frequency regulation, flexible ramping, and black start services besides their energy storing and shifting capabilities. To ensure reliable and safe operation, identifying the bad battery cells in a Utility-Scale BESS is of profound importance. This paper proposes a comprehensible method of bad cell identification for Utility-Scale BESS by evaluating the necessary electrical and thermal properties of the cells through statistical approaches. This method only requires data that is easily available and accessible and can save a lot of time and effort. A detailed formulation of the analysis process was carried out and applied to data from a Utility-Scale BESS. Results demonstrated that the method can successfully identify bad cells in a BESS containing a large number of cells. This approach can offer prospective economic benefits by reducing the Operation and Maintenance (O&M) costs associated with Utility-Scale BESS.

1 January 2022 in SSRN Electronic Journal
Verified
Preprint
Open access
PDF file
JYJubair Yusuf
Jubair Yusuf
AHA. S. M. Jahid Hasan
A. S. M. Jahid Hasan
LELuis Fernando Enriquez-Contreras
Luis Fernando Enriquez-Contreras
SUSadrul Ula
Sadrul Ula
Building sector is the largest energy user in the United States. Conventional building energy studies mostly involve Heating, Ventilation, and Air Conditioning (HVAC), and lighting energy consumptions. Recent additions of solar Photovoltaics (PV) along with other Distributed Energy Resources (DER), particularly Plug-in Electric Vehicles (PEV) have added a new dimension to this problem and made it more complex. An avant-garde framework is proposed for selecting the best charging/discharging level of PEV for a commercial building-integrated microgrid in this paper. A typical commercial building is used as a microgrid testbed incorporating all the DERs presented in a smart building. A Mixed Integer Linear Programming (MILP) problem is formulated to optimize the energy and demand cost associated with this building operation. The cost function is solved in conjunction with real data and modified to assess the bidirectional PEV impacts on the flexible building loads that are contributing factors in making energy usage decisions. Finally, the impacts of optimized DERs are investigated on a Distribution System (DS) to show the necessity of a holistic approach for selecting the suitable PEV strategies. The results show that bidirectional fast PEV activities can provide higher cost reduction and less voltage deviation in comparison to slow PEV activities.