Miguel Asensio

Miguel Asensio

Auto-generated profile, based on publicly available information

Miguel Asensio

E.T.S. de Ingenieros Industriales, University of Castilla-La Mancha, Ciudad Real, Spain

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 April 2016 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
MAMiguel Asensio
Miguel Asensio
PQPilar Meneses de Quevedo
Pilar Meneses de Quevedo
Gregorio Muñoz-DelgadoGregorio Muñoz-Delgado
Gregorio Muñoz-Delgado
Javier ContrerasJavier Contreras
Javier Contreras
The first part of this two-paper series describes the incorporation of demand response (DR) and energy storage systems (ESSs) in the joint distribution and generation expansion planning for isolated systems. The role of DR and ESS has recently attracted an increasing interest in power systems. However, previous models have not been completely adapted in order to treat DR and ESS on an equal footing. The model presented includes DR and ESS in the planning of insular distribution systems. Hence, this paper presents a novel model to decide the joint expansion planning of distributed generation and the distribution network considering the impact of ESS and price-dependent DR programs. The problem is formulated as a stochastic-programming-based model driven by the maximization of the net social benefit. The associated deterministic equivalent is formulated as a mixed-integer linear program suitable for commercially available software. The outcomes of the model are the location and size of new generation and storage units and the distribution assets to be installed, reinforced or replaced. In the second companion paper, an insular case study (La Graciosa, Canary Islands, Spain) is provided illustrating the effects of DR and ESS on social welfare.

22 February 2017 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
MAMiguel Asensio
Miguel Asensio
Gregorio Muñoz-DelgadoGregorio Muñoz-Delgado
Gregorio Muñoz-Delgado
Javier ContrerasJavier Contreras
Javier Contreras
This paper presents a bi-level model for distribution network and renewable energy expansion planning under a demand response (DR) framework. The role of DR has recently attracted an increasing interest in power systems. However, previous models have not been completely adapted in order to treat DR on an equal footing. The target of the distribution network and generation planner, modeled through the upper-level problem, is to minimize generation and network investment cost while meeting the demand. This upper-level problem is constrained by the lower-level problem, stressing the importance of integrating DR to time-varying prices into those investment models. The objective function considered for the lower level is the minimization of overall payment faced by the consumers. Using the Karush-Kuhn-Tucker complementarity constraints, the proposed bi-level model is recast as a mixed-integer linear programming problem, which is solvable using efficient off-the-shelf branch-and-cut solvers. Detailed results from an insular case study (La Graciosa, Canary Islands, Spain) are presented.

27 August 2015 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
MAMiguel Asensio
Miguel Asensio
JCJavier Contreras
Javier Contreras
Isolated regions and islands are facing imported fossil-fuel dependency, higher electricity prices, and vulnerability to climate change. At the same time, they are increasing their renewable penetration and, therefore, risk for electric utilities. Integrating stochastic energy resources in noninterconnected systems may take advantage of an intelligent and optimized risk-averse unit commitment (UC) model. This paper presents a two-stage stochastic UC model with high renewable penetration including reserve requirements for the efficient management of uncertainty. In order to account for the uncertainty around the true outcomes of load, wind, and photovoltaic (PV) generation, a minimum conditional value at risk term has been included in the model formulation. A stochastic measure of the value of the stochastic solution is used to evaluate the benefits of using stochastic programming. The model considers the need for reserves dependent on the forecasting horizon and the amount of renewable generation. Active power demand, and wind and PV generations are considered as probability distribution functions. The model is applied to the Lanzarote-Fuerteventura system in the Canary Islands, Spain, and Crete, Greece.

11 May 2015 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
MAMiguel Asensio
Miguel Asensio
JCJavier Contreras
Javier Contreras
Wind power represents a significant percentage of the Spanish generation mix and this trend will increase due to the commitment of the European Union to the full deployment of Directive 2009/28/EC. The increasing penetration of intermittent renewable energy, and the development of advanced information and communication technologies, give rise to questions on how additional flexibility obtained from loads can be used in order to optimize the use of resources and assets. This paper proposes a comprehensive stochastic decision making model for the coordinated operation of wind power producers and demand response (DR) aggregators participating in the day-ahead market. In order to account for the uncertainty around the true outcomes of day-ahead prices and wind power, a minimum conditional value at risk term has been included in the model formulation. Numerical results illustrate how the proposed bidding strategy for wind and demand response (DR) pairing increases the expected benefit of both resources and reduces the related risk.

12 July 2016 in IEEE Transactions on Sustainable Energy
Verified
Journal Article
Closed access
SSSérgio Santos
Sérgio Santos
DFDesta Zahlay Fitiwi
Desta Zahlay Fitiwi
ABAbebe Worke Bizuayehu
Abebe Worke Bizuayehu
MSMiadreza Shafie-Khah
Miadreza Shafie-Khah
MAMiguel Asensio
Miguel Asensio
João P. S. CatalãoJoão P. S. Catalão
João P. S. Catalão
This paper presents a novel multi-stage stochastic distributed generation investment planning model for making investment decisions under uncertainty. The problem, formulated from a coordinated system planning viewpoint, simultaneously minimizes the net present value of costs rated to losses, emission, operation, and maintenance, as well as the cost of unserved energy. The formulation is anchored on a two-period planning horizon, each having multiple stages. The first period is a short-term horizon in which robust decisions are pursued in the face of uncertainty; whereas, the second one spans over a medium to long-term horizon involving exploratory and/or flexible investment decisions. The operational variability and uncertainty introduced by intermittent generation sources, electricity demand, emission prices, demand growth, and others are accounted for via probabilistic and stochastic methods, respectively. Metrics such as cost of ignoring uncertainty and value of perfect information are used to clearly demonstrate the benefits of the proposed stochastic model. A real-life distribution network system is used as a case study and the results show the effectiveness of the proposed model.

19 August 2019 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Mahdi Pourakbari-KasmaeiMahdi Pourakbari-Kasmaei
Mahdi Pourakbari-Kasmaei
MAMiguel Asensio
Miguel Asensio
Matti LehtonenMatti Lehtonen
Matti Lehtonen
Javier ContrerasJavier Contreras
Javier Contreras
This paper proposes a trilateral bilevel stochastic mixed integer bilevel linear programming (MIBLP) model to handle a joint master-slave operation-planning problem. This model considers the interactions among an integrated community energy system (ICES), prosumers, and the wholesale electricity market (WM). The ICES, in the upper level, makes a joint optimal photovoltaic (PV) and energy storage system plan taking into account the concurrent interactions with the WM and prosumers to maximize its profit. On the other hand, in the lower level, the prosumers aim at minimizing their bills via an optimal PV-package sizing while interacting with the ICES and the WM simultaneously. The strong duality theorem is used to recast this MIBLP model into an equivalent single-level model. Since the lower level is also an operation-planning problem, this recast results in a mixed integer nonlinear programming (MINLP) model that prevents finding a satisfactory solution. To remedy this issue, sensitivity analysis and a separation-based linearization technique are applied. Numerical results illustrate the effective performance of the proposed business model while providing valuable information for the ICES and consumers.