1 January 2012 in AASRI Procedia
1 June 2025 in International Journal of Applied Power Engineering (IJAPE)
The distribution system is seeing a dramatic shift as a result of the increasing use of distributed generators (DGs) and plug-in electric vehicles (PEVs), or plug-in hybrid electric cars. The research endeavors to optimize the allocation of photovoltaic (PV) based DGs within radial distribution systems (RDS) while accommodating the load demand stemming from PEVs. A weighted-sum based multiobjective (WMO) technique is employed in this study to optimize three fundamental technical metrics of the distribution network: achieving the best possible voltage stability index (VSI) while reducing real power loss and total voltage variation to a minimum. Initially, the study investigates the impact of both conventional and PEVs load demand, considering PEVs load demand on distribution system performance under three charging scenarios: a situation involving peak charging, scenario involving off-peak charging, and scene of random charging. Subsequently, PV units are strategically planned, taking into account the PEVs demand within the distribution system utilizing an innovative weighted multiobjective electric eel foraging optimization (WMOEEFO) algorithm, its effectuality is validated with weighted multiobjective differential evolutionary (WMODE) and weighted multiobjective grey wolf optimization (WMOGWO) algorithms on standard test system IEEE 33-bus.
1 June 2025 in Indonesian Journal of Electrical Engineering and Computer Science
The integration of renewable power sources into the grid presents a complex challenge, as the grid operates at AC voltage, while photovoltaic (PV) arrays generate DC power. A 3-phase inverter synchronizes with the grid’s voltage and frequency for efficient energy integration. In conventional technique, a 3-ph 6-switch (B6) inverter is used for sharing the power to the grid. In this paper reduced switch count 3-ph 4-switch (B4) inverter topology is introduced with reduced power losses. This topology has 4 insulated gate bipolar transistor (IGBT) switches and two capacitors replacing the other 2 switches positioned in one leg of the inverter, which connects to a grid connected PV system. A grid synchronization method called synchronous reference frame (SRF) based proportional integral (PI) is used to track the phase angle of the grid and subsequently inject current into the grid. A B4 inverter is operated by a novel space vector pulse width modulation (SVPWM) control technique which operates in 4 possible switching states. A comparative analysis is carried out with the PV array grid integration connected through B4 and B6 inverter topologies with SRF control. The modeling and design are carried out in a MATLAB/Simulink environment with graphs plotted according to the conditions. The comparative analysis validates the importance of SRF controllers for the grid integration of any renewable source.