2 September 2022 in Science Advances
MOXIE [Mars Oxygen In Situ Resource Utilization (ISRU) Experiment] is the first demonstration of ISRU on another planet, producing oxygen by solid oxide electrolysis of carbon dioxide in the martian atmosphere. A scaled-up MOXIE would contribute to sustainable human exploration of Mars by producing on-site the tens of tons of oxygen required for a rocket to transport astronauts off the surface of Mars, instead of having to launch hundreds of tons of material from Earth’s surface to transport the required oxygen to Mars. MOXIE has produced oxygen seven times between landing in February 2021 and the end of 2021 and will continue to demonstrate oxygen production during night and day throughout all martian seasons. This paper reviews what MOXIE has accomplished and the implications for larger-scale oxygen-producing systems.
1 May 2023 in Journal of Spacecraft and Rockets
The Mars Oxygen ISRU Experiment (MOXIE) is an instrument onboard NASA’s Perseverance rover. On April 20th, 2021, MOXIE generated oxygen on Mars from the carbon dioxide present in the Martian atmosphere, demonstrating, for the first time, in-situ resource utilization (ISRU) on the surface of another celestial body. Learnings from MOXIE on Mars have aided in the design of a scaled-up version of MOXIE. Oxygen generated from this scaled-up system would be used as propellant in a Mars Ascent Vehicle that would enable the crew to return to Earth once their mission was complete, as well as in life support systems. Failure of any of its subsystems would result in a loss of mission due to the inability of the crew to return to Earth. Accordingly, risk analysis is one of the most crucial steps in the design of the scaled-up MOXIE that must be completed and understood before building and launching the system to Mars. The intent of this paper is to present a comprehensive, quantitative analysis of the operational risks associated with this Mars ISRU plant. We then present an approach to optimize the reliability of each subsystem using a modified probabilistic risk assessment and heuristics-based optimization algorithm.
26 June 2026 in Acta Astronautica