There has been a strong increase of penetration of renewable energies into power systems. However, the renewables pose new challenges for the operation of the networks. Particularly, wind power is intermittently fluctuating, and, therefore, the network operator has to fast update the operations correspondingly. This task should be performed by an online optimization. Therefore, real-time optimal power flow (RT-OPF) has become an attractive topic in recent years. This paper presents an overview of recent studies on RT-OPF under wind energy penetration, offering a critical review of the major advancements in RT-OPF. It describes the challenges in the realization of the RT-OPF and presents available approaches to address these challenges. The paper focuses on a number of topics which are reviewed in chronological order of appearance: offline energy management systems (EMSs) (deterministic and stochastic approaches) and real-time EMSs (constraint satisfaction-based and OPF-based methods). The particular challenges associated with the incorporation of battery storage systems in the networks are explored, and it is concluded that the current research on RT-OPF is not sufficient, and new solution approaches are needed.
Developing a suitable framework for real-time optimal power flow (RT-OPF) is of utmost importance for ensuring both optimality and feasibility in the operation of energy distribution networks (DNs) under intermittent wind energy penetration. The most challenging issue thereby is that a large-scale complex optimization problem has to be solved in real-time. Online simultaneous optimization of the wind power curtailments of wind stations and the discrete reference values of the slack bus voltage which leads to a mixed-integer nonlinear programming (MINLP) problem, in addition to considering variable reverse power flow, make the optimization problem even much more complicated. To address these difficulties, a two-phase solution approach to RT-OPF is proposed in this paper. In the prediction phase, a number of MINLP OPF problems corresponding to the most probable scenarios of the wind energy penetration in the prediction horizon, by taking its forecasted value and stochastic distribution into account, are solved in parallel. The solution provides a lookup table for optional control strategies for the current prediction horizon which is further divided into a certain number of short time intervals. In the realization phase, one of the control strategies is selected from the lookup table based on the actual wind power and realized to the grid in the current time interval, which will proceed from one interval to the next, till the end of the current prediction horizon. Then, the prediction phase for the next prediction horizon will be activated. A 41-bus medium-voltage DN is taken as a case study to demonstrate the proposed RT-OPF approach.
In recent years, there has been a huge trend to penetrate renewable energy sources into energy networks. However, these sources introduce uncertain power generation depending on environmental conditions. Therefore, finding 'optimal' and 'feasible' operation strategies is still a big challenge for network operators and thus, an appropriate optimization approach is of utmost importance. In this paper, we formulate the optimal power flow (OPF) with uncertainties as a chance constrained optimization problem. Since uncertainties in the network are usually 'non-Gaussian' distributed random variables, the chance constraints cannot be directly converted to deterministic constraints. Therefore, in this paper we use the recently-developed approach of inner-outer approximation to approximately solve the chance constrained OPF. The effectiveness of the approach is shown using DC OPF incorporating uncertain non-Gaussian distributed wind power.