O. Salem

O. Salem

Auto-generated profile, based on publicly available information

O. Salem

Assistant Professor, Civil Engineering Dept., Applied Science Univ., P.O. Box 926296, Amman 11931, Jordan

Research Focus & Metrics

Academic Career Length

23Years (2004-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2006 in Journal of Management in Engineering
Verified
Journal Article
Closed access
OSO. Salem
O. Salem
JSJ. Solomon
J. Solomon
AGA. Genaidy
A. Genaidy
IMI. Minkarah
I. Minkarah
This article compares the techniques developed for lean construction with those developed for lean manufacturing. Lean manufacturing and lean construction techniques share many common elements despite the obvious differences in their assembly environments and processes. Manufacturing plants and construction sites are different in many ways that might explain why lean production theories and practices do not fully fit the construction industry. Though many lean construction tools and elements are still in an embryonic state, lean construction techniques are gaining popularity because they can affect the bottom line of projects. Additionally, this paper presents a study of a construction project in which specific lean construction elements were tested. Each technique was evaluated in terms of its impact on the performance of the project. Based on the findings of the study, a new “lean assessment tool” is proposed to quantify the results of lean implementations. The assessment tool evaluates six lean constru...

1 March 2008 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
SDS. Dabke
S. Dabke
OSO. Salem
O. Salem
AGAsh Genaidy
Ash Genaidy
NDNancy Daraiseh
Nancy Daraiseh
Existing research on women in construction focuses on engineers and entrepreneurs, yet little to no attention has been given to women in trades. Thus, the aim of this research is to review the literature on tradeswomen and to conduct a localized study to determine if demographic variables affect satisfaction with work, pay, opportunities, supervision, and people on the job for tradeswomen. These variables include age, education, number of dependents, number of trade years, duration of work, and frequency of work outside of the local area. Thirty-nine tradeswomen from the Cincinnati area were surveyed to assess their satisfaction or dissatisfaction with construction work. Currently, the literature review indicates that research on tradeswomen is limited and largely restricted to identifying measures that can attract and retain women in construction trades. Studies on motivation and job satisfaction of construction workers neither identify nor compare perceptions of tradeswomen about their work. Results of ...

1 December 2007 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
OSO. Salem
O. Salem
ASA. Shahin
A. Shahin
YKY. Khalifa
Y. Khalifa
Materials that are in the form of one-dimensional stocks such as steel rebars, structural steel sections, and dimensional lumber generate a major fraction of the generated construction waste. Cutting one-dimensional stocks to suit the construction project requirements result in trim or cutting losses, which is the major cause of the one-dimensional construction waste. The optimization problem of minimizing the trim losses is known as the cutting stock problem (CSP). In this paper, three approaches for solving the one-dimensional cutting stock problem are presented. A genetic algorithm (GA) model, a linear programming (LP) model, and an integer programming (IP) model were developed to solve the one-dimensional CSP. Three real life case studies from a steel workshop have been studied. The generated cutting schedules using the GA, LP, and IP approaches are presented and compared to the actual workshop’s cutting schedules. The comparison shows a high potential of savings that could be achieved using such tech...

1 September 2004 in Human Factors and Ergonomics in Manufacturing & Service Industries
Verified
Journal Article
Closed access
PDF file
SAS. Abdallah
S. Abdallah
AGAsh Genaidy
Ash Genaidy
OSO. Salem
O. Salem
WKW. Karwowski
W. Karwowski
RSR. Shell
R. Shell

1 June 2008 in Journal of Architectural Engineering
Verified
Journal Article
Closed access
AHA. Abu Hammad
A. Abu Hammad
OSO. Salem
O. Salem
MHM. Hastak
M. Hastak
MSM. Syal
M. Syal
Productivity improvement of manufactured housing (MH) production systems has been a great concern to manufacturers and production managers. Studies show that a typical manufactured housing plant fails to produce at desired capacity and production rate because of several shortcomings. The evaluation of the production system efficiency in the factory is essential for meeting the growing demand of customers with respect to design and size of the housing product. It is imperative to explore alternative layout designs that would be more efficient and productive. A decision support system (DSS) is proposed to assist the user in selecting an efficient layout design matching specified requirements and business constraints. The DSS framework covers interrelated factors of: (1) the market demand; (2) MH organization; (3) MH production process; and (4) MH production planning and facility design. Existing MH factories can utilize simulation and optimization components of the DSS in streamlining their activities and l...

1 May 2006 in Practice Periodical on Structural Design and Construction
Verified
Journal Article
Closed access
OSO. Salem
O. Salem
BBB. Basu
B. Basu
RMR. Miller
R. Miller
JRJ. Randall
J. Randall
JSJ. Swanson
J. Swanson
RER. Engel
R. Engel
The Ohio Department of Transportation (ODOT) created Strategic Initiative Number 9 to “build bridges smarter, faster and better.” One project undertaken by ODOT was to use a precast, post-tensioned slab bridge in place of a cast-in-place slab. To accommodate school schedules and a festival, the bridge was to be completed in 16 days. However, the bridge was actually completed in 19 days. Delays were due to weather, equipment problems, and confusion over plans and specifications. Contributing to the success of the project was the effective partnering between ODOT and the contractor, along with a high level of upfront planning. However it is necessary to address problems such as the lack of contingency plans and some unexpected issues that were overlooked in the planning phase.