Yulu Zhou

Yulu Zhou

Auto-generated profile, based on publicly available information

Yulu Zhou

Department of Industrial Engineering and Management, Shanghai Jiao Tong University, Shanghai, China

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 January 2026 in IEEE Transactions on Systems, Man, and Cybernetics: Systems
Verified
Journal Article
Open access
YZYulu Zhou
Yulu Zhou
JLJun Lv
Jun Lv
Shichang DuShichang Du
Shichang Du
XSXiaoxiao Shen
Xiaoxiao Shen
MLMolin Liu
Molin Liu
Pallet automation systems (PASs) are critical in flexible manufacturing for their ability to integrate diverse production resources, such as machines, fixture pallets (FPs), and setup stations (STs). In traditional flexible manufacturing systems (FMSs), loading/unloading typically occurs at machines, limiting the machines’ capacity. To address this, in PASs, workpieces are loaded and unloaded from the machines at a limited number of STs, so loading, processing, and unloading are three separate segments. However, the research on PASs is limited, and existing studies mainly focused on machines while overlooking FPs and STs. A critical challenge is the tight coupling between resource selection and operation sequencing. To address this gap, we investigate a multiresource-constrained flexible job shop scheduling problem (MRFJSP) with FPs and STs under PASs (MRFFS). First, a mixed-integer programming model is proposed to minimize makespan. Second, a four-layer encoding scheme and a new decoding method with time period insertion based on the intersection of available time of multiple resources (TPI-IARs) are presented to obtain feasible schedule solutions and shrink the search space. Third, a new search algorithm based on critical paths and points mutation (SACP) is developed to effectively balance exploration and exploitation. Finally, four case studies are designed to demonstrate the validity and effectiveness of this work.

11 April 2025 in TechRxiv
Verified
Preprint
Open access
YZYulu Zhou
Yulu Zhou
JLJun Lv
Jun Lv
SDShichang Du
Shichang Du
XSXiaoxiao Shen
Xiaoxiao Shen
MLMolin Liu
Molin Liu
With the development of multi-variety, small-batch flexible manufacturing, pallet automation systems (PAS) have attracted increasing attention from many manufacturing enterprises. A critical challenge is the flexible job shop scheduling problem (FJSP) because resources are flexible and limited in the PAS. However, most existing studies on FJSP primarily focused on machines while overlooking other key resources such as pallets, fixtures, setup stations (SUs), and the loading and unloading time (LUT). This can result in scheduling plans that are not feasible in practice. To address this gap, this paper investigates a multiresource constrained flexible pallet automation system scheduling considering fixture-pallets and SUs, referred to as MRFPAS. To solve the problem, we propose a mixed-integer programming model that reflects real production scenarios. Additionally, we develop a new search algorithm based on critical paths and points (SACP). A case study is designed and executed to demonstrate the validity and effectiveness of this work. Furthermore, it emphasizes the importance of rationally allocating SUs is to reduce the makespan and improve the utilization rate of each SU. This study offers potential solutions for achieving fully automated resource scheduling in unmanned production.