1 January 2014 in Production & Manufacturing Research
This research is motivated by a real world production scheduling problem in a continuous manufacturing system involving multiple objectives, multiple products and multiple processing lines with various inventory, production and quality constraints. Because of the conflicting objectives, a global optimization approach is considered as not feasible by the plant management. Given a customer demand forecast, two practical heuristic or sequential optimization algorithms are developed to generate daily production schedules for two primary objectives: minimize shipment delays (pull-backward procedure) and minimize average inventory levels (push-forward procedure). A third heuristic algorithm (reduce switch-over procedure) which is based on the current management practice is also developed to serve as a benchmark. A factorial experiment was performed to evaluate the performance of the heuristic procedures and to identify factors that might affect the performance differences among heuristics. Since each heuristic is designed to give priority to one of the three conflicting objectives, none of them is absolutely superior to the other algorithms in all aspects. However, the first two heuristic procedures performed better than the current management practice in shipment delays and average daily inventory. The production schedules generated by the two procedures also satisfy the quality constraints. The experimental results also showed that the performance of the algorithms is significantly affected by product mix, inventory levels, and demand pattern.
20 February 2020 in International Journal of Aerospace Engineering
A roll-pitch seeker has a wide field of view but suffers from a singularity as the sightline coincides with the outer gimbal (OG) axis. In the vicinity of the singularity, the tracking effectiveness is often degraded or even lost due to the high actuation demand on OG, which is known as the zenith pass problem. To solve this problem, this paper first proposes a novel motion model of sightline to predict the singularity in a receding horizon, where the model parameters are identified using a modified recursive least square estimator. And with the singularity predictions as set points, a predictive functional controller is then designed for the OG position control to minimize the tracking error. This novel combination control scheme is validated in MATLAB/Simulink. Simulation results have confirmed that the proposed scheme can significantly mitigate the zenith pass problem and be applied to the real-time tracking process.
11 November 2019 in Journal of Ambient Intelligence and Humanized Computing
1 January 2016 in International Journal of Advanced Media and Communication
Coal and gas outburst is a very complex phenomenon of dynamic disaster in coal mine, where exists a complex non-linear mapping relationship which could not be described with functions between outburst risk and its influential factors. In this paper, from operator theory, the choice of initial parameters is optimised, and genetic algorithm is improved. Mathematical model of coal and gas outburst risk prediction is established, and the improved genetic algorithm was applied to the risk prediction model.