1 June 2012 in Journal of Construction Engineering and Management
Road tunnel construction is subject to underground uncertainties and risks, and as such it is difficult to predict the final construction cost, especially at the conception phase where issues are evaluated and important design decisions are made. A system assisting in the early cost estimation of road tunnels would therefore be of great value as it would allow the quick costing of alternative and more economical solutions. The development of such an early cost estimation system is discussed in this paper. First, the basic parameters (geological, geometrical, and work quantities-related) affecting temporary and permanent support and final construction cost are determined. After that, appropriate real-world data derived from the analysis of 33 twin tunnels of 46 km total length constructed for the Egnatia Motorway in northern Greece from 1998 to 2004 and related to work quantities is collected and normalized. Appropriate price lists are then applied to calculate the costs; subsequently, cost-estimat...
10 October 2012 in Computational Economics