Pertti Lahdenperä

Pertti Lahdenperä

Auto-generated profile, based on publicly available information

Pertti Lahdenperä

VTT Technical Research Centre of Finland Ltd

Research Focus & Metrics

Academic Career Length

27Years (2000-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2012 in Construction Management and Economics
Verified
Journal Article
Closed access
PLPertti Lahdenperä
Pertti Lahdenperä
Collaborative construction project arrangements have been the subject of many development efforts owing to the frustration felt toward the opportunism inherent in traditional contracting. Globally, three approaches have stood out: project partnering, project alliancing and integrated project delivery. These so-called relational project delivery arrangements have much in common. This study aims to clarify the similarities and differences between the arrangements by examining their key concepts and features one by one and in relation to each other; the motivation behind each is also examined. Early involvement of key parties, transparent financials, shared risk and reward, joint decision-making, and a collaborative multi-party agreement are some of the features incorporated in all the arrangements to a varying degree. Beyond the numerous details, divergent applications and constant evolution presented, the study also recognizes project alliancing as a project delivery system in its own right due to its contractual structure that integrated project delivery aims to imitate while introducing some management approaches not included in project alliancing. Project partnering, although developed in leaps and bounds since its introduction, takes a more conservative approach to work scope and liabilities. Similarly, project alliancing takes relational contracting to the extreme compared to the current forms of integrated project delivery and, especially, project partnering.

17 August 2020 in International Journal of Managing Projects in Business
Verified
Journal Article
Closed access
JKJaakko Kujala
Jaakko Kujala
KAKirsi Aaltonen
Kirsi Aaltonen
NGNadezhda Gotcheva
Nadezhda Gotcheva
PLPertti Lahdenperä
Pertti Lahdenperä
Purpose: The purpose of this study is to create a framework to analyze approaches for coordination, adaptation and safeguarding of exchanges in interorganizational project networks.Design/methodology/approach: An analysis framework to analyze governance in project networks was created based on a systematic review of existing literature. The framework was applied to analyze governance approaches used in a large infrastructure project implemented with an alliance project delivery method to illustrate the practical validity of the framework.Findings: The analysis framework categorized governance in project networks in six dimensions: goal setting, rewarding, monitoring, roles and decision-making, coordination and capability building. A set of questions for each governance dimension was created and the analysis framework was applied in the context of a project alliance.Research limitations/implications: The focus of this research is on governance internal to a project network. The authors identified dimensions of governance in project networks and related governance approaches based on a systematic literature review. The practical applicability of the framework was validated in a single case study setting.Practical implications: The paper introduces a concept of governance in project networks, which takes the perspective that all actors that have an influence on project implementation are part of an interorganizational project network. The focal organization may have had a significant role in the design of governance, but governance also emerged from the network structure of companies and the interactions among them. The analysis framework created in this research can be used to design and analyze governance in different type of project context.Originality/value: The paper introduces a concept of governance in project networks, which takes the perspective that all actors that have an influence on project implementation are part of an interorganizational project network.

1 July 2010 in Construction Management and Economics
Verified
Journal Article
Closed access
PLPertti Lahdenperä
Pertti Lahdenperä
The owner may involve design and construction service providers in a project at different stages of planning and design. Early involvement of the versatile know‐how of service providers places the owner at the services providers’ mercy as to pricing. Late involvement, when design is close to completion, allows using price competition to ensure reasonable pricing. Then, design usually does not involve interplay between the key parties to benefit the project. The aim of the conceptualization is to overcome the above‐mentioned problem by generating a novel type of two‐stage target‐cost contracting system which combines early selection and price containment. There the calculated tender price is based on both the owner’s estimates and the tenderers’ unit cost and overhead data while the project scope is not yet fully established. Selected service providers then develop the project and its designs in cooperation with the owner before the actual target‐cost is set. Incentives have been created to lower the target‐cost below the earlier calculated tender price. The idea is to spur actors to invest especially in the critical pre‐implementation development phase. Subsequent risk sharing is believed to increase the cooperation between parties further. The model offers a means, especially for European public owners, to enter into a cooperative relationship that is of value in the case of projects involving special challenges and a great deal of uncertainty. The European Procurement Act requires costs to be taken into account in the selection.

23 June 2017 in Construction Economics and Building
Verified
Journal Article
Open access
PDF file
PLPertti Lahdenperä
Pertti Lahdenperä
Alliancing is a relatively new construction project delivery method receiving increasing interest globally while also eliciting many questions about its effectiveness. That is why its operating logic should be clarified beyond the currently existing general views. Correspondingly, this paper aims to define the means and mechanisms which influence the capacity of alliancing to produce value for money. The work establishes the interlaced impact chains between formal basic solutions of alliancing and the key result areas defining the value-for-money ratio. This is made by focussing on a single alliance project and its procedural solutions and experiences. The case project of the study was an urban road tunnel under a city structure and the impact chains were explored by interviewing all eight members of the alliance leadership team covering all contracting parties. The two-stage personal interviews were conducted in accordance with the systematic modelling procedure resulting in eight cognitive maps which were then combined into a group map. The resulting model included around one hundred interlinked concepts initially, but was streamlined for the paper. Accordingly, alliancing offers a concrete framework which gives better than normal chances of success in the case of complex, challenging projects fraught with much uncertainty. Many diverse basic alliance solutions/features contribute to success, while each feature also seems to strengthen the impact of the others. This suggests that, at its best, pure project alliance is not only a coherent but also a holistic solution to challenging projects.

23 April 2024 in International Journal of Managing Projects in Business
Verified
Journal Article
Open access
PDF file
AKAnna Kadefors
Anna Kadefors
KAKirsi Aaltonen
Kirsi Aaltonen
SGStefan Christoffer Gottlieb
Stefan Christoffer Gottlieb
OKOle Jonny Klakegg
Ole Jonny Klakegg
PLPertti Lahdenperä
Pertti Lahdenperä
CTChristian Thuesen
Christian Thuesen
Purpose: Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level learning in this field. This paper employs an institutional perspective to analyze how legitimacy for relational contracting has been produced and challenged in Denmark, Finland, Norway and Sweden, including implications for dissemination and learning.Design/methodology/approach: A collaborative case study design is used, where longitudinal accounts of the developments in relational contracting over more than 25 years in four Nordic countries were developed by scholars based in each country. The descriptions are underpinned by literature sources from research, practice and policy.Findings: The countries share similar problem perceptions that have triggered the de-institutionalization of traditional contracting practices. Models and policies developed elsewhere are important sources of knowledge and legitimacy. Most countries have seen pendulum movements, where dissemination of relational contracting is followed by backlashes when projects fail to meet projected outcomes. Before long, however, relational contracting tends to re-emerge under new labels and in slightly new forms. Such a proliferation of concepts presents further obstacles to learning. Successful institutionalization is found to rely on realistic goals in combination with broad competence development at the organizational and industry levels.Practical implications: In seeking inspiration from other countries, policymakers should go beyond contract models to also consider strategies to manage industry-level learning.Originality/value: The paper provides a unique longitudinal cross-country perspective on the field of relational contracting. As such, it contributes to the small stream of literature on long-term institutional change in the construction sector.

1 December 2007 in Journal of Infrastructure Systems
Verified
Journal Article
Closed access
TKTiina Koppinen
Tiina Koppinen
PLPertti Lahdenperä
Pertti Lahdenperä
Lately project delivery methods where the implementer offers broader service packages are increasingly used in infrastructure projects worldwide. At the same time, the number of alternative project delivery methods has increased making selection of the best one difficult. The road authority must understand the features of the methods in order to select the most effective ones in terms of economic efficiency. To assist in the selection, this research compared the operating principles and performance of design–bid–build, construction management, design–build (DB), and design–build–maintain (DBM) based on an international interview survey and an extensive literature review. Opinions presented by the interviewees and literature review all pointed to the same direction. Based on the analysis of road procurement, broader service packages give, on average, better value for the money and enable clients to attain their goals better than more traditional methods. DB and DBM seem to outperform more conservative procurement methods both in cost and value generation terms. Each method, however, is particularly suitable for specific projects and should be selected accordingly.