Cindrawaty Lesmana

Cindrawaty Lesmana

Auto-generated profile, based on publicly available information

Cindrawaty Lesmana

Universitas Kristen Maranatha

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 March 2023 in PengabdianMu: Jurnal Ilmiah Pengabdian kepada Masyarakat
Verified
Journal Article
Open access
PDF file
MSMiky Endro Santoso
Miky Endro Santoso
EDElliati Djakaria
Elliati Djakaria
TDTessa Eka Darmayanti
Tessa Eka Darmayanti
KKKrismanto Kusbiantoro
Krismanto Kusbiantoro
CLCindrawaty Lesmana
Cindrawaty Lesmana
LLLeonardo Leonardo
Leonardo Leonardo
Jamblang Chinatown, Cirebon was once known as a trading city during the Dutch colonial period, as a place for buying and selling and stopping by traders from various regions through the river that flows nearby. The river is a means of transportation that brings ships from the interior of Cirebon to the Java Sea, and vice versa. However, the current situation is reversed because Jamblang is like a "dead city" that is almost forgotten. The government and the community have a dream to revive the Jamblang Chinatown area. Through this PKM activity, a team of lecturers and students of the Faculty of Fine Arts and Design at Maranatha Christian University seeks to revive Jamblang Chinatown by making murals with the surrounding community, as well as providing education as well as performances for the surrounding community through PKM activities. The attraction of making murals containing the historical value of Jamblang. The approach taken is a participatory collaborative workshop with local residents, through mentoring and education. The result achieved is a mural with the theme Mural History Jamblang, which is located on a 90-degree wall and is located in front of Vihara Dharma Rhakita, Jamblang, Cirebon Regency. They participate in the process of making murals. Other residents are interested in knowing the meaning contained in the visualization of the mural. And many are just selfies with a mural as a background. This mural-making attraction is also quite successful as one of the activities that attract public attention during the 2022 Jamblang Festival.

31 October 2022 in Jurnal Teknik Sipil dan Perencanaan
Verified
Journal Article
Closed access
PDF file
EGEgi Gustian
Egi Gustian
RMRoi Milyardi
Roi Milyardi
CLCindrawaty Lesmana
Cindrawaty Lesmana
Everywhere in the world, especially as the fourth industrial revolution begins, technological advancements are being discussed. This technological advancement also affects the building industry, one example being the use of Building Information Modeling (BIM) technology. All technologies, particularly BIM, will advance and redevelop throughout this Covid-19 epidemic. BIM has benefits and barriers to implementation that increase with its development and sophistication, particularly for contractors. Therefore, it's important to research the advantages of using BIM as well as the barriers for contractors. The purpose of this study is to analyze the benefits and inhibiting factors in the implementation of BIM in building construction for contractor. This research was conducted by using literature from previous studies to find out what statements are the benefits and barrier factors in the implementation of BIM 4D for contractors with top and middle qualifications. Then the statement was compiled into a questionnaire and distributed to respondents via online platform. In addition to obtaining the mean value for each research variable, the questionnaire survey responses were processed utilizing validity and reliability tests. The findings of this study show that the benefits of BIM implementation for top contractors include better and more appealing building design or modeling, more accurate documentation, as well as better and more attractive building design or modeling for middle contractors. The lack of training and education in BIM itself is the main obstacle to its implementation for these top contractors, while the cost of licensing BIM software or apps is fairly high for midrange contractors.

16 June 2022 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
CLCindrawaty Lesmana
Cindrawaty Lesmana
Hsuan-Teh HuHsuan-Teh Hu
Hsuan-Teh Hu
TPTsun-Chen Pan
Tsun-Chen Pan
ZLZih-Shu Lin
Zih-Shu Lin
Finite element analysis has been commonly used in many studies to examine the performance of structural elements. The objective of this article is to assess the relevance of geometric and strengthened pattern uncertainty on prestressed reinforced concrete beams strengthened by fiber-reinforced plastics based on a nonlinear finite element analysis. The parametric study focuses on the significant effects of fiber-reinforced polymer, beam length, and prestressed load on the ultimate loading capacity of the prestressed reinforced concrete beam strengthened by fiber-reinforced plastics. The results demonstrate the advantages of fiber-reinforced plastics that significantly increase the stiffness and the ultimate loading capacity of prestressed reinforced concrete beams. It is found that the beams that are strengthened by the FRP with fibers oriented at 0° have better results than other orientation angles.

30 June 2024 in Jurnal Manajemen Teknologi & Teknik Sipil
Verified
Journal Article
Open access
PDF file
BVBunga Olivia Verel
Bunga Olivia Verel
RMRoi Milyardi
Roi Milyardi
CLCindrawaty Lesmana
Cindrawaty Lesmana
In the implementation of housing development, the problem of late payment delays is a common issue encountered in commercial and subsidized housing projects during construction. These delays impact the timely completion and lead to disputes among the involved parties, which include owners, contractors, and subcontractors. This study aims to analyze the primary factors contributing to late payment in construction projects, specifically in commercial and subsidized housing. The analysis is conducted from the perspective of the owner, contractors, and subcontractors. The study involves six owner respondents, six contractor respondents, and four subcontractor respondents. The survey results were analyzed using the Analytical Hierarchy Process (AHP) to assess the significance of various factors influencing payment delays in both housing schemes. The analysis results indicate that financial issues with the owner's company are crucial factors from the owner's perspective in causing payment delays in both commercial and subsidized housing projects. A major challenge faced by contractors is the lack of capital availability, which can lead to delays that affect all involved parties. Meanwhile, discrepancies between job specifications not following the contract from the subcontractor's viewpoint highlight the importance of clear communication and rigorousness. All parties involved in housing projects need to improve financial management, enhance capital procurement, and tighten the supervision of contract implementation. By identifying key factors, adopting best practices can help mitigate the risk of payment delays and improve efficiency in future housing project implementations, whether commercial or subsidized.

30 October 2024 in Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS)
Verified
Journal Article
Open access
CSCamelia Rafella Suryamisena
Camelia Rafella Suryamisena
RMRoi Milyardi
Roi Milyardi
CLCindrawaty Lesmana
Cindrawaty Lesmana
Perkuatan struktur kolom beton bertulang pada gedung pabrik memiliki pengaruh pada kegiatan operasional, secara khusus pendapatan dari pabrik. Pada pemilihan metode perkuatan pada pabrik, estimasi kerugian pendapatan perlu dipertimbangkan selain kriteria umum lainnya. Studi ini bertujuan mendapatkan perbandingan metode perkuatan kolom beton bertulang antara metode steel jacketing (SJ) dan penggunaan carbon fiber reinforced polymers (CFRP) pada gedung pabrik berdasarkan aspek biaya, durasi pekerjaan, dan dampak kerugian pendapatan operasional pabrik. Studi kasus dilakukan pada fasilitas gedung pabrik di Provinsi Lampung, dengan 2 kolom yang akan diperkuat hasil analisis tahapan studi sebelumnya. Analisis biaya dan durasi dilakukan mengacu Analisis Harga Satuan Pekerjaan (AHSP) PerMen PUPR No.28/PRT/M/2016 dan harga satuan daerah pada wilayah Provinsi Lampung. Estimasi kerugian operasional pendapatan (YLOSi) pabrik dikalkulasi melalui pendekatan model HAZUS. Hasil penelitian menunjukkan pada aspek biaya, metode CFRP memiliki biaya yang lebih besar dengan selisih 37,02% dibandingkan metode SJ. Pada aspek durasi pelaksanaan, metode CFRP memiliki durasi yang lebih singkat dengan selisih 2 hari (40,00%) dibandingkan metode SJ. Pada aspek YLOSi pabrik menunjukkan metode CFRP memiliki estimasi kerugian lebih kecil dengan selisih 40,00% dibandingkan metode SJ. Namun pada total biaya tanggungan (biaya pelaksanaan dan estimasi kerugian), metode CFRP memiliki nilai lebih besar 24,28% dibandingkan metode SJ.

26 May 2023 in JMTS: Jurnal Mitra Teknik Sipil
Verified
Journal Article
Open access
PDF file
JIJaya Iskandar
Jaya Iskandar
RMRoi Milyardi
Roi Milyardi
CLCindrawaty Lesmana
Cindrawaty Lesmana
Road infrastructure as a means of transportation has an important role in the economy of a region. The ability of road infrastructure to serve the community is not only needed under normal conditions but is also needed when a disaster occurs as part of disaster resilience. One of the approaches that can be used in assessing disaster preparedness is mapping disaster risk on the road sections under review. In this research, a case study of disaster risk mapping was carried out on the Pasauran-Sp. Labuan - Cibaliung and Citereup-Tanjung Lesung, Banten Province which is divided into 11 road sections. Disaster risk mapping on roads in Padegelang is very much needed with disaster-prone locations making it very prone to disasters, especially floods, tsunamis, earthquakes, and landslides. The aim of this study is to map disaster risk based on the value of the multi-disaster risk index (floods, tsunamis, earthquakes, and landslides) on the Pasauran-Sp. Labuan-Cibaliung and Citereup-Tanjung Lesung. Disaster risk mapping is carried out using the procedures of Director General of Highways Circular Letter no. 12/SE/Db/2014 concerning Guidelines for risk analysis of natural disasters affecting roads and bridges. With this disaster risk map, it is hoped that it will be useful for stakeholders to make decisions related to disaster mitigation on these roads. The results of the multi-disaster disaster risk index values obtained from this study in sections 9, 10 and 11 have a low risk level, in sections 1,3,5 and 6 have a medium risk level, and in sections 2,4,7 and 8 have a high level of risk