1 November 2010 in Water Science & Technology
Sulfide is present in wastewaters as well as in biogas and can be removed by several physicochemical and biotechnological processes. Nitrate is a potential electron acceptor, readily available in most wastewater treatment plants and it can replace oxygen under anoxic conditions. A lab-scale reactor was operated for treatment of sulfide containing wastewater with nitrate as an electron acceptor and is used to evaluate the effects of volumetric loading rates, hydraulic retention time (HRT) and substrate concentrations on the performance of the lithotrophic denitrification process for treating industrial fermentation wastewaters. Sulfide is removed more than 90% at the loading rates between 0.055 and 2.004 kg S−2/m3 d, when the influent sulfide concentration is kept around 0.163 kg/m3 and the HRT decreased from 86.4 to 2 h. Nitrogen removal differed between 23 and 99% with different influent NO3−-N concentration and loading rates of NO3−/S−2 ratio. The stoichiometry of sulfide oxidation with nitrate is calculated assuming different end-products based on thermodynamic approach and compared with experimental yield values. The calculated maximum volumetric and specific sulfide oxidation rates reached 0.076 kg S−2/m3 h and 0.11 kg S−2/kg VSS h, respectively. The results are obtained at industrially relevant conditions and can be easily adapted to either biogas cleaning process or to sulfide containing effluent streams.
27 January 2025 in Chemical Engineering Science
22 May 2024 in Marine Pollution Bulletin
1 November 2019 in Journal of Ecological Engineering
In Turkey, commercial laundry wastewater is usually discharged to the receiving water bodies and the reuse potential of them is ignored. This wastewater is grouped into the greywater due to their content of organic and inorganic pollutants. Recent years, the sequential processes have become more...
22 December 2016 in Water and Environment Journal
23 June 2025 in Water, Air, & Soil Pollution
In this study, the removal of microplastics (MPs) in secondary treatment effluent by ozone (O3) oxidation was evaluated. The study was carried out with three samples taken from Wastewater Treatment Plant (WWTP) discharge point. MPs between 200–5000 µm were identified in terms of number, shape, colour and type and then treated by O3 oxidation in batch experiments. Taguchi design method was applied for process optimization. The parameters pH, ozone dose and reaction time were selected as the main factors affecting O3 oxidation. The optimal conditions for MPs removal were pH 7, reaction time 60 min and O3 dose 10 ppm. In the verification experiments carried out under this conditions, an average MP removal efficiency of 83% was obtained. FTIR analyses were performed on raw and treated wastewater. Five different polymer structures, Polyethylene (PE), Polypropylene (PP), Polyester (PES), Polyethylene terephthalate (PET) and Polyurethane (PUR) were determined in raw wastewater. It was determined that these species were converted into low molecular weight organic compounds after ozone treatment. The results of kinetic studies were found to be in accordance with first order reaction kinetics (k = 0.02243 min−1). The cost of MP removal by ozone oxidation at the optimum experimental condition was 0.094 €/m3.