Alexandros N. Nordas

Alexandros N. Nordas

Auto-generated profile, based on publicly available information

Alexandros N. Nordas

ETH Zurich, Zurich, Switzerland

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 November 2023 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Open access
PDF file
TLThomas Leone
Thomas Leone
ANAlexandros N. Nordas
Alexandros N. Nordas
GAGeorgios Anagnostou
Georgios Anagnostou
The present work aims to improve the reliability of shield jamming and lining damage risk assessment in squeezing ground by analysing the effects of creep on the evolution of rock pressure over time. The study is based on numerical simulations of typical mechanised tunnelling processes, generally consisting of shield advance phases alternating with shorter or longer standstills for lining installation, maintenance, etc. A linear elastic—viscous plastic constitutive model based upon Perzyna’s overstress theory is employed, which considers the time-dependency of plastic deformations via a single viscosity parameter. The investigations demonstrate the following: (i) shield loading during advance increases with increasing viscosity under certain conditions, which contradicts the common perception in many existing works that creep is thoroughly favourable for shield jamming; (ii) creep is thoroughly unfavourable for shield loading during long standstills and long-term lining loading, due to the additional viscoplastic ground deformations manifested over time; (iii) the commonly adopted simplifying assumption of continuous excavation with the gross advance rate is adequate only where standstills are very short (e.g., for lining erection during the stop-and-go shield tunnelling process), but otherwise underestimates the shield loading, even in cases of regular inspection and maintenance standstills lasting only a few hours. Two application examples, the Fréjus safety gallery and the Gotthard Base tunnel, demonstrate the need to consider creep and the accuracy of modelling tunnel construction by a semi-discrete approach, where only the very short standstills for lining erection are considered via an average advance rate, but longer standstills are explicitly simulated.

20 July 2024 in Journal of Rock Mechanics and Geotechnical Engineering
Verified
Journal Article
Open access
ANAlexandros N. Nordas
Alexandros N. Nordas
LCLinard Cantieni
Linard Cantieni
GAGeorgios Anagnostou
Georgios Anagnostou
When tunnelling through low-permeability saturated ground, the pore pressure decreases in the vicinity of the cavity. In certain instances of deep tunnels crossing weak rocks, the pore pressure may even become negative. All existing analytical solutions for the undrained ground response curve (GRC) in the literature assume that the ground fully retains its saturation, in which case the development of negative pore pressures has a stabilising effect – it results in increased effective stresses, and thus shearing resistance, which in turn leads to reduced deformations and plastification. In practice, however, negative pore pressures can induce partial or complete ground desaturation, which may even invalidate the premise of undrained conditions and lead to considerably increased deformations and plastification. In such cases, existing solutions are unsafe for design. The present paper aims to address this shortcoming, by presenting a novel analytical solution for the undrained GRC which incorporates the effect of the excavation-induced desaturation. The solution is derived under the assumption that the ground desaturates completely and immediately under negative pore pressures, which provides the upper bound of deformations and plastification for cases of partial desaturation. The rock is considered to be a linear elastic, brittle-plastic material, obeying a non-associated Mohr-Coulomb (MC) yield criterion. Nevertheless, the solution is also applicable to perfectly plastic rocks via a simple modification of the input parameters. Although the solution is in general semi-analytical, simple closed-form expressions are obtained in the special case of non-dilatant rocks. These expressions are also applicable to rocks exhibiting limited dilatancy, which is usually the case. An application example, based on the planned deep geological repository for radioactive waste in Switzerland, demonstrates the significant practical value and usefulness of the novel solution and underscores its necessity in cases where existing solutions that disregard desaturation are rendered thoroughly unsafe for design.

13 March 2024 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Open access
PDF file
TLThomas Leone
Thomas Leone
ANAlexandros N. Nordas
Alexandros N. Nordas
GAGeorgios Anagnostou
Georgios Anagnostou
Although squeezing ground may undergo rapid convergences following tunnel excavation, its behaviour is often markedly time dependent due to creep or consolidation. The effects of creep and consolidation on shield tunnelling are comparatively evaluated in two companion papers, with the aim of demonstrating their qualitative similarities and distinctive features. The present, first paper investigates the basic time effects, placing focus on the time development of ground deformations and the complex interaction between ground, tunnel boring machine (TBM) and tunnel support during excavation and during construction standstills. The presented numerical simulations indicate several qualitative similarities between the two mechanisms of time dependency, in respect of the time development of ground deformations, the counter-intuitive behaviour of increasing shield loading with increasing rate of advance under certain conditions, as well as the thoroughly adverse effect of the additional time-dependent deformations taking place during construction standstills on the shield loading. However, they also underscore two prominent differences resulting from the fundamentally different nature of creep (a purely mechanical rheological process) and consolidation (a coupled hydromechanical process): first, the consistently more extensive plastic yielding in consolidating ground, which is partially associated with the seepage forces exerted by the pore water on the solid rock constituents. Second, the role of seepage forces as a potential destabilising agent, particularly for the tunnel face, which does not happen in the case of creep and may be critical for shield and cutterhead jamming. Building upon these investigations, the companion paper compares creep and consolidation with respect to the transferability of experiences about the required thrust force to tunnels of different diameter or to adjacent tunnels.

4 November 2023 in Computers and Geotechnics
Verified
Journal Article
Open access
TLThomas Leone
Thomas Leone
ANAlexandros N. Nordas
Alexandros N. Nordas
GAGeorgios Anagnostou
Georgios Anagnostou

28 October 2024 in Journal of Rock Mechanics and Geotechnical Engineering
Verified
Journal Article
Open access
ANAlexandros N. Nordas
Alexandros N. Nordas
MNMatteo Natale
Matteo Natale
LCLinard Cantieni
Linard Cantieni
GAGeorgios Anagnostou
Georgios Anagnostou
KKKovári K.
Kovári K.
The deep geological repository for radioactive waste in Switzerland will be embedded in an approximately 100 m thick layer of Opalinus Clay. The emplacement drifts for high-level waste (approximately 3.5 m diameter) are planned to be excavated with a shielded tunnel boring machine (TBM) and supported by a segmental lining. At the repository depth of 900 m in the designated siting region Nördlich Lägern, squeezing conditions may be encountered due to the rock strength and the high hydrostatic pressure (90 bar). This paper presents a detailed assessment of the shield jamming and lining overstressing hazards, considering a stiff lining (resistance principle) and a deformable lining (yielding principle), and proposes conceptual design solutions. The assessment is based on three-dimensional transient hydromechanical simulations, which additionally consider the effects of ground anisotropy and the desaturation that may occur under negative pore pressures generated during the drift excavation. By addressing these design issues, the paper takes the opportunity to analyse some more fundamental aspects related to the influences of anisotropy and desaturation on the development of rock convergences and pressures over time, and their markedly different effects on the two lining systems. The results demonstrate that, regardless of these effects, shield jamming can be avoided with a moderate TBM overcut, however overstressing of a stiff lining may be critical depending on whether the ground desaturates. This uncertainty is eliminated using a deformable system with reasonable dimensions of yielding elements, which can also accommodate thermal strains generated due to the high temperature of the disposal canisters.

9 July 2024 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Open access
PDF file
ANAlexandros N. Nordas
Alexandros N. Nordas
TLThomas Leone
Thomas Leone
GAGeorgios Anagnostou
Georgios Anagnostou
This paper investigates potential differences between creep and consolidation in mechanised tunnelling through squeezing ground, placing focus on the practical question of using experiences gained from existing tunnels about the required thrust force as a reference for tunnels of different diameter or adjacent tunnels. The investigations focus on two aspects. First, the effect of the tunnel diameter on the risk of shield jamming is examined. The paper demonstrates that larger-diameter tunnels are more favourable in poor-quality ground, while the opposite holds in better-quality ground, as well as in the case of pronouncedly time-dependent ground behaviour due to consolidation or creep. Second, the effect of a tunnel on the required thrust force in a neighbouring tunnel built later is examined. The paper shows that this interaction effect is particularly important in water-bearing ground of low permeability, where the drainage action of the first tunnel induces pore pressure relief and ground consolidation in an extensive area, leading to a remarkable reduction of the thrust force in the second tunnel. Conversely, in the case of creep the interaction is negligible even under extremely squeezing conditions, due to the fundamentally different nature of the purely mechanical rheological processes from coupled hydromechanical processes. The presented investigations into the transferability of experiences are valuable for tunnelling practice, in cases of twin tunnels as well as in situations where a smaller-diameter tunnel is constructed prior to the main tunnel (e.g. a pilot tunnel for exploration, advance drainage or ground improvement), or also the opposite (e.g. upgrade of a road tunnel by later construction of a safety tunnel with a smaller diameter).