Lina Bertling Tjernberg

Lina Bertling Tjernberg

Auto-generated profile, based on publicly available information

Lina Bertling Tjernberg

Division of Electric Power and Energy Systems, KTH Royal Institute of Technology, Stockholm, Sweden

Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 May 2010 in IEEE Transactions on Sustainable Energy
Verified
Journal Article
Closed access
FBFrançois Besnard
François Besnard
LBLina Bertling
Lina Bertling
A sound maintenance planning is of crucial importance for wind power systems. There is a large potential in cost savings by optimizing maintenance decisions to make the projects more cost-efficient. This paper presents an approach to optimize condition-based maintenance strategies for components which degradation can be classified according to the severity of the damage. The approach is applicable to inspection-based maintenance as well as maintenance based on online condition-monitoring systems. This enables us to compare the maintenance strategies within a unified framework. First decisions associated with the different maintenance strategies are optimized, then the expected life cycle maintenance costs of the strategies are compared. The model is applied to blades of wind turbine in order to compare three maintenance strategies: visual inspection, inspection with a condition-monitoring technique (e.g., ultrasonic or thermography), and online condition monitoring (e.g., fiber optic). It is shown that online condition monitoring is the optimal maintenance strategy for high failure rate and low crack time to failure. In other cases, inspection with condition-based maintenance is slightly more beneficial.

1 March 2012 in IEEE Transactions on Energy Conversion
Verified
Journal Article
Closed access
KFKatharina Fischer
Katharina Fischer
FBFrancois Besnard
Francois Besnard
LBLina Bertling
Lina Bertling
The concept of reliability-centered maintenance (RCM) is applied to the two wind-turbine models Vestas V44-600 kW and V90-2MW. The executing RCM workgroup includes an owner and operator of the analyzed wind turbines, a maintenance service provider, a provider of condition-monitoring services, and wind-turbine component supplier as well as researchers at academia. Combining the results of failure statistics and assessment of expert judgement, the analysis is focused on the most critical subsystems with respect to failure frequencies and consequences: the gearbox, the generator, the electrical system, and the hydraulic system. This study provides the most relevant functional failures, reveals their causes and underlying mechanisms, and identifies remedial measures to prevent either the failure itself or critical secondary damage. This study forms the basis for the development of quantitative models for maintenance strategy selection and optimization, but may also provide a feedback of field experience for further improvement of wind-turbine design.

1 June 2012 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
DSDavid Steen
David Steen
LTLe Anh Tuan
Le Anh Tuan
OCOla Carlson
Ola Carlson
LBLina Bertling
Lina Bertling
A massive introduction of plug-in electric vehicles (PEVs) in the transportation sector would likely increase the total electricity consumption. Depending on how and when the PEVs are charged, the effects on the power demand will vary. Previous studies have shown that uncontrolled charge of PEVs can cause problems for the distribution system in some areas. This paper proposes an approach to control PEVs charging based on the charging behavior estimated from the demographical statistical data. In this approach, three different charge strategies are designed and the impacts of PEVs charging on the distribution system is assess using standard load flow calculations. A case study using the proposed approach examines the real situation in Gothenburg, a city on the west coast of Sweden. The results from the study show that the impacts on the distribution system due to PEVs vary between different areas. By controlling the charging, the impacts can be reduced but the choice of control methods must be chosen carefully. Furthermore, the results indicate that a well-developed public charging infrastructure could reduce the stress on the residential distribution systems since part of the charging can be done in commercial areas.

19 June 2012 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
PWPeng Wang
Peng Wang
ZGZhiyong Gao
Zhiyong Gao
LBLina Bertling
Lina Bertling
In a power system with high renewable power penetration, uncertain and intermittent characteristics of renewable energy resources become major concerns of system planning and operation. In such a power system, conventional thermal or hydro units have to be dispatched, shut down or started up more frequently to incorporate load, renewable resource variation and system failures. Slow ramp up (or down) of conventional units may cause energy shortage (or surplus) in power systems with high wind power penetration or in isolated micro grids with limited dispatchable capacity. This paper proposes a technique to evaluate operational reliability and energy utilization efficiency of power systems with high wind power penetration. The ramp rate of a conventional generator and energy storage system (ESS) are considered in the proposed technique. The effect of slow ramp-up rate or fast reduction of wind speed on system reliability is measured by the expected energy not supplied. A new index designated as the expected energy not used is proposed and formulated to represent energy surplus due to fast increase of wind speed and slow ramp down of conventional units. The IEEE-RTS is used to illustrate the applications of the proposed method.

4 January 2013 in IEEE Transactions on Sustainable Energy
Verified
Journal Article
Open access
FBFrançois Besnard
François Besnard
KFKatharina Fischer
Katharina Fischer
LTLina Bertling Tjernberg
Lina Bertling Tjernberg
Maintenance of offshore wind power plants is known to be extensive and costly. This paper presents a model for optimizing the maintenance support organization of an offshore wind farm: the location of maintenance accommodation, the number of technicians, the choice of transfer vessels, and the use of a helicopter. The model includes an analysis of a transportation strategy using alternative transportation means, a queuing model of maintenance activities, and an economic model of the maintenance support organization. An example based on a generic 100 wind turbine 5-MW wind farm is used to demonstrate the application of the model. The results show the benefit of the production losses of the different options, which enables the identification of an optimal maintenance support organization based on the reliability, logistic costs, and electricity price. The most cost-efficient maintenance support organization in the case study consists of an offshore accommodation with technicians on service 24 hours a day, 7 days a week. The solution suggests transportation by use of a crew transfer vessel equipped with a motion compensated access system.

29 October 2007 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
PHPatrik Hilber
Patrik Hilber
VMVladimiro Miranda
Vladimiro Miranda
MMManuel A. Matos
Manuel A. Matos
LBLina Bertling
Lina Bertling
A major goal for managers of electric power networks is maximum asset performance. Minimal life cycle cost and maintenance optimization becomes crucial in reaching this goal, while meeting demands from customers and regulators. This necessitates the determination of the optimal balance between preventive and corrective maintenance in order to obtain the lowest total cost. The approach of this paper is to study the problem of balance between preventive and corrective maintenance as a multiobjective optimization problem, with customer interruptions on one hand and the maintenance budget of the network operator on the other. The problem is solved with meta-heuristics developed for the specific problem, in conjunction with an evolutionary particle swarm optimization algorithm. The maintenance optimization is applied in a case study to an urban distribution system in Stockholm, Sweden. Despite a general decreased level of maintenance (lower total maintenance cost), better network performance can be offered to the customers. This is achieved by focusing the preventive maintenance on components with a high potential for improvements. Besides this, this paper displays the value of introducing more maintenance alternatives for every component and choosing the right level of maintenance for the components with respect to network performance.