1 March 2019 in Chemical Engineering Journal
1 January 2021 in Chemical Engineering Science
14 June 2024 in Proceedings of the Combustion Institute
1 August 2026 in SSRN Electronic Journal
Continuous and economically viable operation of biogas-based power-to-gas (PtG) systems is challenged by volatile electricity prices and seasonal mismatches between renewable electricity supply and biogas availability. This study investigates a flexible upgrading concept that enables rapid switching between conventional membrane-based biogas upgrading and direct methanation, thereby enabling year-round biomethane grid injection while restricting PtG operation to economically favourable periods.A detailed process model combining experimentally validated, rate-based unit models for membrane separation and bubbling fluidised-bed methanation is developed and applied to three PtG process configurations. These configurations are evaluated against a conventional two-stage membrane upgrading process by means of a comprehensive techno-economic analysis that accounts for historical electricity price distributions and future renewable-dominated electricity market scenarios.The results show that flexible operation increases total specific production cost by approximately 0.5 €-ct./kWh but significantly reduces the sensitivity of biomethane production cost to PtG operating hours and electricity price volatility. Predictable production costs of 13.2–13.5 €-ct./kWh are achieved for PtG operation times as low as 4000 h/a. Additional cost reductions are possible through CO2 separation and valorisation, enabling negative-emission operation during non-PtG periods.The proposed flexible concept provides a robust pathway for the integration of renewable electricity storage, biomethane production, and biogenic CO2 capture in future low-carbon energy systems.