1 January 2024 in Structural Control and Health Monitoring
Existing dam displacement statistical methods simulate the thermal effects using simple harmonic functions ignoring the effects of ice periods, extreme heat, and seasonal weather. Moreover, existing data‐driven methods usually utilize a separate modeling strategy, inevitably ignoring the spatiotemporal correlation of multiple displacement points in dams, resulting in poor predictive performance. To overcome these shortcomings, this study proposes a novel machine learning (ML)—aided multiple‐point dam displacement predictive model considering the temperature hysteresis effect. Firstly, an improved hydraulic‐Air_temperture_Time (HTairT) statistical monitoring model is developed using the measured air temperature lagging monitoring data. On this basis, the multitask Gaussian process regression (multipoint GPR) algorithm with an improved kernel function to construct a multipoint deformation prediction model for ultrahigh arch dams. Then, the improved meta‐heuristic physics‐driven Frost algorithm is utilized to determine the optimal parameters of the multipoint GPR model. A high arch dam with a height of 305 m is used as the case study, and five displacement monitoring points are used for validation. Five advanced ML‐based algorithms are used to comparatively evaluate and verify the performance of the proposed method in terms of forecast accuracy and interpretability. The HTairT statistical model can better simulate the hysteresis effect of temperature on dam deformation. Moreover, the Frost‐optimized dam multipoint displacement prediction model with the RQ kernel functions outperforms the other comparison methods in terms of R2, mean absolute error (MAE), and root mean squared error (RMSE) evaluation indicators. This indicates the proposed method can mine the spatiotemporal correlation among multiple monitoring points of ultrahigh arch dams, further improving the overall deformation prediction and uncertainty estimation.
1 January 2020 in Advances in Civil Engineering
To address the track irregularity at transition zones between subgrade and rigid structures (bridge, tunnel, etc.), some common transition approaches, such as trapezoid subgrade, were adopted in many engineering areas. However, in regard to a mountainous area, the common transition approaches may not be practicable anymore due to the limitation of the length between subgrade and rigid structures. In this paper, a new type of bridge‐tunnel transition section with a deeply buried pile‐plank structure (DBPPS) for short‐distance transition is introduced. A three‐dimensional finite element model that considers vehicle‐track‐subgrade coupling vibration is proposed to study the dynamic performances of a DBPPS transition section in the Shanghai–Kunming high‐speed railway. With this model that has been validated with measured responses from field tests, the dynamic responses and the smoothness in track stiffness along the transition zone are analyzed. In addition, the influences of train speed, axle load, and train direction on dynamic responses are investigated, and the influences of two optimization strategies, including varying‐length piles and constant‐length piles, on the stiffness smoothness of the DBPPS transition section are discussed. Results show that the vibration level of the DBPPS transition section is lower than that of the abutment and the tunnel, and the additional load caused by vertical track stiffness difference aggravates the vibration at the connections between the DBPPS transition section and the abutment (or tunnel). Furthermore, the smoothness in stiffness along the transition zone can be significantly improved by the improvement strategy with varying‐length piles.
6 April 2023 in International Journal of Rail Transportation
The transition subgrade is widely applied between the general subgrade and rigid structures (such as abutments, culverts, and tunnels) to reduce the degradation rate of track structures in high-speed railways. To address the problem that the common-type transition subgrade cannot be applied in mountainous areas due to the short distance between the tunnel and the subgrade (or abutment), a new type of pile-plank structure (PPS) transition subgrade for short-distance transition was proposed, and the PPS subgrade was successfully applied to a bridge-tunnel transition zone in the Shanghai-Kunming high-speed railway, China. A series of field tests, including vibration acceleration and velocity tests, were carried out in the bridge-tunnel transition zone to evaluate the transition performance of the PPS subgrade using the effective value and power spectral density method. In addition, an FE model that considers the coupled vehicle-track-subgrade-foundation interaction was established to fully reveal the dynamic performance of the PPS subgrade by characterizing the change rate of rail deflection, the dynamic response distribution of the track structure along the transition zone, and the running quality of the train comfort. The results show that the proposed PPS transition subgrade has a good transition performance and meets the requirements for excellent train comfort.