Mohammed Abdulkhaleq Ibrahim

Mohammed Abdulkhaleq Ibrahim

Auto-generated profile, based on publicly available information

Mohammed Abdulkhaleq Ibrahim

Civil Engineering Department, Alnahrain University, Baghdad, Iraq

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2015 in Journal of Membrane Science
Verified
Journal Article
Closed access
ZIZainab Z. Ismail
Zainab Z. Ismail
MIMohammed A. Ibrahim
Mohammed A. Ibrahim

1 January 2019 in Desalination and Water Treatment
Verified
Journal Article
Open access
ZAZiad Abd Ali
Ziad Abd Ali
HFHussain M. Flayeh
Hussain M. Flayeh
MIMohammed A. Ibrahim
Mohammed A. Ibrahim

1 August 2012 in Engineering and Technology Journal
Verified
Journal Article
Open access
PDF file
MIMohammed Abdulkhaleq Ibrahim
Mohammed Abdulkhaleq Ibrahim
The aim of this study was to assess a spatial and temporal variations in water quality of the Euphrates River flowing through Iraqi lands, with two approaches: the use of water quality index (WQI) and a principal component analysis (PCA). In the studied section of the river the global water quality WQI was 63.09 (classified as medium – slightly polluted), this value denotes that Euphrates water requires treatment for drinking, no treatment necessary for most industries and crop uses and suitable for most fish and not recommended for sensitive one. PCA results indicate that three factors for river water explain 92.95% of the total variance. Varifactors obtained from factor analysis for water quality variations indicate that factors responsible for water quality variations are mainly related to soil leaching and runoff process, organic pollution from municipal effluents, pH and temperature.

28 January 2016 in Desalination and Water Treatment
Verified
Journal Article
Open access
HAHitham Alshami
Hitham Alshami
RARozi Abddullah
Rozi Abddullah
MIMohammed A. Ibrahim
Mohammed A. Ibrahim
MSMd Azlin Md Said
Md Azlin Md Said
Oil and water separation due to gravitation is extensively applied in water and wastewater treatment to get rid of the oil droplets. Optimum inlet baffle configuration may facilitate the formation of favorable flow fields and heighten the separator tank’s removal efficiency. Experimental tests were carried out to ascertain appropriate position for an inlet baffle in a rectangular separator tank. There are four parts in the experimental measurements. First of all, measured velocity fields make use of an acoustic Doppler velocimeter. Second of all, the uniformity of flow is measured by drawing a comparison of the standard deviation of the velocity profile. The oil concentration at both inlet and outlet points was later on assessed. Finally, the separation tank’s removal efficiency was evaluated. The results provide an indication that a uniform flow pattern improved when the inlet baffle position gave a minimum standard deviation value. In this case, the minimum concentration of oil at the outlet and the highest removal efficiency have been obtained.

1 November 2020 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
HAHitham Alshami
Hitham Alshami
MIMohammed A. Ibrahim
Mohammed A. Ibrahim
HHHaitham A. Hussein
Haitham A. Hussein
HGHassan Hameed Gatiea
Hassan Hameed Gatiea
Agriculture is the only source of the Tigris and Euphrates Rivers in Iraq. Annually more than 70% of the available water is used for irrigation. The total amount of land that can be cultivated in Iraq is 12 million hec. Only 2.2 million hec in Tigris basin and 1.37 million hec in the Euphrates basin were cultivated in 2001. According to the development of the projects in Turkey and development irrigation in Syria for the Euphrates basin, Iraq will face reduction in the amount of water entering Iraq with 50% for Tigris basin and 80% for Euphrates basin and with deficit of 21-22 billion cubic meters for the coming year 2030. The existing area of marshland restoration equal to 58%. The study suggests in case to increase the area of restoration Marshland to 75%, it should be need water amount to 2.5 BCM or 70 m3/s continuously with existing discharge.

15 February 2018 in Research Journal of Applied Sciences, Engineering and Technology
Verified
Journal Article
Open access
PDF file
AAAlaa H. Alshami
Alaa H. Alshami
HHHaitham A. Hussein
Haitham A. Hussein
MIMohammed A. Ibrahim
Mohammed A. Ibrahim
Developing integrated marches management for restoration of the southern marshes in Iraq require adequate reliable plan. The aim of this study is developing the Chibayish region. In this study, economic feasibility and cost analysis for constructing embankment across Euphrates River and overflow weir are conducted. These structures are used to regulate the Euphrates River during the flood season and the deficit period and improve the quality of water in central marshes. In addition, this feasibility study examines the effect of establishing the controlling regulator on increasing the area of cultivation of the Malha irrigation project and improving the livestock with fish capturing in the region. The economic analysis and feasibility calculations showed that the time of payback period is equal to 7 years after 3 years from the construction time and the rate of the benefit cost B/C is equal to one when the discount rate is equal to 22%. By these results we can consider the project to be economically feasible and can improve the income of local people at Chibayish Marshes region.