Bin Yu

Bin Yu

Auto-generated profile, based on publicly available information

Bin Yu

BGRIMM Technology Group, Beijing 100160, China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 December 2024 in Minerals
Verified
Journal Article
Open access
PDF file
WWWei Wang
Wei Wang
BYBin Yu
Bin Yu
WXWenyuan Xu
Wenyuan Xu
KYKai Yang
Kai Yang
YYYanying Yin
Yanying Yin
Mengyuan LiMengyuan Li
Mengyuan Li
This paper reviews recent advancements in the pipeline transport performance of paste backfill slurry in long-distance underground backfilling operations, with a primary focus on applications in metal mines. Key aspects, including flow performance, energy consumption during transport, and operational stability, are discussed in detail. Slurry concentration and rheological properties, including viscosity, yield stress, and flow behavior, as well as particle size distribution, are examined for their effects on transport efficiency. The relationship between these characteristics and pipeline resistance is also examined. Factors like pipeline orientation, configuration, diameter, length, elbow design, and elevation gradients are explored, demonstrating that careful design can optimize flow performance, reduce energy consumption, and minimize the risk of blockages and bursts. Additionally, the roles of commonly used additives, such as water reducers, foaming agents, antifreeze agents, and thickeners, are discussed in terms of their impact on slurry flowability, stability, and resistance losses. Optimal slurry regulation, strategic pipeline design, and effective additive utilization improve flow efficiency, extend service life, and reduce maintenance costs, thereby ensuring reliable backfill operations. Future research should focus on innovative pipeline designs, such as improving material selection and configuration to optimize flow stability and reduce energy consumption. Advanced additives, including thickeners and water reducers, could further enhance slurry flowability, reduce pipeline resistance, and improve system reliability.

23 December 2022 in Metals
Verified
Journal Article
Open access
PDF file
ZLZongnan Li
Zongnan Li
BYBin Yu
Bin Yu
Lijie GuoLijie Guo
Lijie Guo
WXWenyuan Xu
Wenyuan Xu
Yue ZhaoYue Zhao
Yue Zhao
XPXiaopeng Peng
Xiaopeng Peng
The sublevel open stoping with backfill method has recently been widely used in underground metal mines. The primary CPB stope is frequently affected by blasting in the secondary ore stope, leading to stope collapse and ore dilution, which has become a common problem and has received widespread attention. Numerical simulations are carried out in the present work, and a 1/4 numeral model consisting of a primary CPB stope and a secondary ore stope is built. The secondary ore stope is divided into four layers on average in the simulation model, and the incident stress induced by each blasting at the interface of the CPB and ore is simulated. The results show that the CPB stope in the range within the height of the explosive charge induced horizontal compressive stress and tensile stress induced from the explosive charge height, while the mined section under the charge height has no obvious blasting impact. The maximum incident compressive stress is close to 1.2 MPa and occurs in the area closest to the blast hole The maximum induced tensile stress occurs in the range above the charge height, which is about 0.2 MPa. The stress ratios of the four-layered lift blasts are 3.6%, 3.8%, 4.0%, and 4.8%, respectively, showing a slight cumulative effect of layered blasting. In addition, the positive correlation between incident stress and the stress ratio is studied in the present work, and the results show that the greater the incident stress is, the greater the incident ratio is.