Yongjia Gao

Yongjia Gao

Auto-generated profile, based on publicly available information

Yongjia Gao

Rocket Force University of Engineering

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 April 2025 in IEEE Transactions on Instrumentation and Measurement
Verified
Journal Article
Closed access
CLCan Li
Can Li
ZFZhichao Feng
Zhichao Feng
ZZZhijie Zhou
Zhijie Zhou
YGYongjia Gao
Yongjia Gao
This study presents a novel dynamic method for evaluating the performance of high-valued complex systems. It aims to address the following 3 problems in performance evaluation of this type of system, including limited observation data of system states, uncertainty in expert knowledge, and high real-time requirement. To address these challenges, we expand the discernment frame of the Belief Rule Base (BRB) to the power set (BRB-P), enhancing its capacity to handle limited data and uncertain expert knowledge. The belief rules are integrated using the evidential reasoning algorithm, ensuring the interpretability of the framework. Simultaneously, we introduce a new optimization model to enhance the real-time performance of the framework and mitigate the explosion of belief rule combinations when dealing with multiple input features. Furthermore, we develop a utility-based framework reduction method to adaptively adjust the discernment framework of BRB-P. This enables the structure and parameters of the framework to be dynamically trained using real-time observation data. An experimental illustration is presented to demonstrate the effectiveness of the proposed framework.

1 July 2025 in AIP Advances
Verified
Journal Article
Open access
CLCan Li
Can Li
ZFZhichao Feng
Zhichao Feng
XLXinsan Li
Xinsan Li
ZZZhijie Zhou
Zhijie Zhou
YGYongjia Gao
Yongjia Gao
A laser inertial measurement unit (LIMU) is a navigation subsystem for rockets, airplanes, and other systems, and its reliability is highly demanding. Maintenance and selection based on performance evaluation are effective ways to improve the reliability of LIMUs. Therefore, this study presents a performance evaluation method for LIMUs under the non-equivalent priority of indicators. First, the LIMUs’ properties and expert knowledge ambiguity are analyzed, and the difficulties in the performance evaluation of LIMUs are described in detail, which are the difficulty in embedding expert knowledge, the explosion of rule combinations, and the non-equivalent priority of indicators, respectively. Second, to address the problems of difficulty in embedding expert knowledge and rule explosion, a hierarchical indicator system is constructed by synthesizing the historical information and test information, and a hierarchical evaluation model is built further. The “or operation” is introduced into the Belief Rule Base (BRB) model to realize the rule formulation and fusion in the case of non-equivalent priority of indicators, and the novel BRB-non-equal priority model is unified with the BRB model in the form of reasoning through the rational design of parameters. Third, an artificial bee colony algorithm is used to optimize the parameters of the hierarchical evaluation model, which can integrate test data and expert knowledge. Finally, using the performance evaluation of 8 LIMUs as a case, the feasibility and superiority of the performance evaluation method are validated.

17 June 2026 in PLOS ONE
Verified
Journal Article
Open access
YGYongjia Gao
Yongjia Gao
JLJieyu Liu
Jieyu Liu
CLCan Li
Can Li
QSQiang Shen
Qiang Shen
RZRuiyan Zhang
Ruiyan Zhang
ZFZhichao Feng
Zhichao Feng
Timely replacement of spare parts can improve the reliability of large-scale equipment operation and is the critical link of preventive maintenance. This paper studies how to reasonably formulate spare parts supply strategy in large-scale equipment maintenance. Given the shortcomings of the conventional fixed cycle replacement method of equipment spare parts, a spare parts replacement method based on large-scale equipment performance degradation is proposed. The proposed method can shorten downtime and avoid waste. Firstly, by analyzing the large-scale equipment’s performance state characteristics, the performance evaluation model of the equipment is established using the interval evidential reasoning approach, and the envelope of performance degradation can be obtained. Weibull distribution is used to fit the performance degradation envelope, and the bisection method and maximum likelihood estimation method are combined to identify the model parameters. The health degree envelope of large-scale equipment performance is obtained. Then, the number of spare parts required is calculated based on health degree expectation. Considering the time required for ordering and transporting spare parts, the spare parts ordering strategy is formulated under the condition of large-scale equipment working simultaneously. Finally, the proposed method is applied to a type of large-scale equipment to verify the effectiveness of the proposed method.

1 August 2026 in IEEE Sensors Journal
Verified
Journal Article
Closed access
YGYongjia Gao
Yongjia Gao
JLJieyu Liu
Jieyu Liu
CLCan Li
Can Li
QSQiang Shen
Qiang Shen
RZRuiyan Zhang
Ruiyan Zhang
ZFZhichao Feng
Zhichao Feng