Alcigeimes Batista Celeste

Alcigeimes Batista Celeste

Auto-generated profile, based on publicly available information

Alcigeimes Batista Celeste

Universidade Federal de Sergipe

Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2009 in Advances in Water Resources
Verified
Journal Article
Closed access
ACAlcigeimes B. Celeste
Alcigeimes B. Celeste
MBMax Billib
Max Billib

13 August 2018 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
Mohammad EhteramMohammad Ehteram
Mohammad Ehteram
HKHojat Karami
Hojat Karami
SMSayed Farhad Mousavi
Sayed Farhad Mousavi
SFSaaed Farzin
Saaed Farzin
ACAlcigeimes B. Celeste
Alcigeimes B. Celeste
Ahmed ElshafieAhmed Elshafie
Ahmed Elshafie

1 September 2008 in Journal of Water Resources Planning and Management
Verified
Journal Article
Closed access
ACAlcigeimes Batista Celeste
Alcigeimes Batista Celeste
KSKoichi Suzuki
Koichi Suzuki
AKAkihiro Kadota
Akihiro Kadota
Real-time reservoir operation models carried out under short operating horizons have no information about the seasonal changes in streamflow. The overall operation may improve provided that long-term information can be incorporated into the short-term process. This paper proposes a procedure that attempts to do such incorporation by means of stochastic and deterministic optimization. Long-term (monthly) and short-term (daily) reservoir inflow forecasts are assumed to be uncertain and reliable, respectively. The idea is to first solve a monthly operation model by an explicit stochastic programming approach and then use its information to guide the daily operation, which is solved by deterministic optimization. The monthly information will decide whether hedging should start being implemented during the daily operation in order to mitigate a potential future shortage. This stochastic-deterministic procedure is applied to a case study in Japan and the results show that it provides operating rules relatively ...

10 June 2009 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
ACAlcigeimes B. Celeste
Alcigeimes B. Celeste
MBMax Billib
Max Billib

22 March 2012 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
ACAlcigeimes B. Celeste
Alcigeimes B. Celeste
MBMax Billib
Max Billib

1 April 2009 in Pesquisa Operacional
Verified
Journal Article
Open access
PDF file
ACAlcigeimes B. Celeste
Alcigeimes B. Celeste
WCWilson F. Curi
Wilson F. Curi
RCRosires C. Curi
Rosires C. Curi
This paper deals with the application of Implicit Stochastic Optimization (ISO) to determine monthly operating rules for a reservoir system located in the semiarid Northeast of Brazil. ISO employs a deterministic optimization model to find optimal reservoir allocations under several possible inflow scenarios and later constructs the rules by analyzing the ensemble of these optimal releases. The operating policies provide the monthly reservoir release conditioned on the storage at the beginning of the month and the inflow predicted for the month. In addition to the classical regression analysis, this study establishes the rules by a two-dimensional interpolation strategy. After the rules are identified, they are applied to operate the system under new inflow realizations and show ability to produce policies similar to those obtained by deterministic optimization taking the same inflows as perfect forecasts.