Yuanye Wei

Yuanye Wei

Auto-generated profile, based on publicly available information

Yuanye Wei

Guangxi University for Nationalities

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2021 in Energy Reports
Verified
Journal Article
Open access
YWYuanye Wei
Yuanye Wei
YZYongquan Zhou
Yongquan Zhou
QLQifang Luo
Qifang Luo
WDWu Deng
Wu Deng

1 January 2021 in SSRN Electronic Journal
Verified
Preprint
Open access
PDF file
YWYuanye Wei
Yuanye Wei
YZYongquan Zhou
Yongquan Zhou
QLQifang Luo
Qifang Luo
Optimal reactive power dispatch (ORPD) problem plays an important role in the reliability and economy of power system. At present, the methods for solving ORPD problems are insufficient in terms of both accuracy and computation time. The inspiration of slime mould algorithm (SMA) comes from the oscillation mode of slime mould foraging in the real world. However, in some cases, SMA skips the real solution and trapped at sub-optimal solution, which leads to premature convergence, which is harmful in determining the global optima. Therefore, in order to alleviate the above -mentioned issues, in this paper, we propose an improved slime mold algorithm (ISMA) to solve ORPD problem. In the performance evaluation, 23 IEEE CEC 2017 benchmark functions are used to compare ISMA with standard SMA and several state-of-the-art algorithms. The experimental results shows that ISMA has strong competition from the mean (standard deviation), Friedman test, Wilcoxon test results and convergence curve. Moreover, as the ORPD problem, this method has been implemented on IEEE 57-bus, IEEE 118-bus and IEEE 300-bus test systems, test power systems and the optimal results obtained are compared with those of the other optimization techniques surfaced in the recent well-established literature. The superiority of this algorithm is proved, and its effectiveness and robustness for solving ORPD problem of power system are also demonstrated.