Ziliang Gao

Ziliang Gao

Auto-generated profile, based on publicly available information

Ziliang Gao

Northwest Engineering Corporation Limited

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 September 2023 in Electrochimica Acta
Verified
Journal Article
Closed access
FLFengfeng Liu
Fengfeng Liu
ZGZiliang Gao
Ziliang Gao
JSJinzhan Su
Jinzhan Su
LGLiejin Guo
Liejin Guo

25 April 2024 in Journal of Power Sources
Verified
Journal Article
Closed access
ZGZiliang Gao
Ziliang Gao
JLJack Todd Lang
Jack Todd Lang
FWFei Wei
Fei Wei
BIBilal Iskandarani
Bilal Iskandarani
YQYongzhen Qi
Yongzhen Qi
YMYu Morimoto
Yu Morimoto

4 September 2025 in International Journal of Hydrogen Energy
Verified
Journal Article
Closed access
FLFengfeng Liu
Fengfeng Liu
XJXingying Ji
Xingying Ji
ZGZiliang Gao
Ziliang Gao
JJJunfei Jiang
Junfei Jiang
YLYuwen Li
Yuwen Li
JSJinzhan Su
Jinzhan Su

26 March 2024 in Chemical Engineering Research and Design
Verified
Journal Article
Closed access
BWBaoyuan Wang
Baoyuan Wang
SYSuyi Yang
Suyi Yang
YLYongquan Lai
Yongquan Lai
ZGZiliang Gao
Ziliang Gao
JSJinzhan Su
Jinzhan Su

23 May 2026 in Fuel
Verified
Journal Article
Closed access
KCKang Chen
Kang Chen
YZYi Zhang
Yi Zhang
ZGZiliang Gao
Ziliang Gao
JXJiantao Xia
Jiantao Xia
YZYuhao Zhao
Yuhao Zhao
YLYoujun Lu
Youjun Lu

7 July 2026 in SSRN Electronic Journal
Verified
Preprint
Open access
STShihang Tan
Shihang Tan
SHShurui Hu
Shurui Hu
Mingtao LiMingtao Li
Mingtao Li
ZGZiliang Gao
Ziliang Gao
KCKang Chen
Kang Chen
YCYubin Chen
Yubin Chen
Coordinating heterogeneous multi-electrolyser systems under renewable forecast uncertainty often requires repeated solution of large dispatch optimisation problems, which limits the online scalability of conventional stepwise rolling dispatch. However, a newly arrived control interval does not necessarily invalidate the multi-step dispatch plan generated by the previous optimisation solve. Event-triggered adaptive-horizon model predictive control (ET-AH-MPC) is developed as a selective re-optimisation framework that decides at each control step whether the existing multi-step dispatch plan should be reused or refreshed. A mixed-integer linear programming (MILP) dispatch model is formulated for heterogeneous alkaline and proton-exchange-membrane electrolysers with five-state transitions to optimise state transitions and power allocation. Event-triggered refresh evaluates stored-plan validity using forecast mismatch, operating-boundary activation, and plan exhaustion, while adaptive-horizon selection determines the look-ahead depth only after a refresh is triggered. Execution-layer recourse converts the selected forecast-based command into an executable command under realised wind power. In case studies with real wind-power data and closed-loop forecast mismatch, ET-AH-MPC retains 98.55% of net profit and 98.63% of hydrogen production relative to a stepwise model predictive control baseline. It also reduces optimisation refreshes and cumulative solving time by 77.86% and 85.85%, respectively. Selective re-optimisation allocates MILP computation to intervals where the stored plan shows validity risk, rather than to every control-execution interval.