Xiaoming He

Xiaoming He

Auto-generated profile, based on publicly available information

Xiaoming He


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2024 in Advances in Civil Engineering
Verified
Journal Article
Open access
YWYujie Wu
Yujie Wu
XHXiaoming He
Xiaoming He
TCTianyi Cui
Tianyi Cui
MWMengze Wu
Mengze Wu
In the context of the advancing construction engineering field in China, there has been a significant increase in the adoption of building information modeling (BIM) technology within engineering–procurement–construction (EPC) projects. This emerging technology is expected to significantly influence the decision‐making practices of professionals in the construction and engineering domain. Consequently, there is an urgent need for comprehensive research focused on construction management specifically pertaining to the effectiveness of construction developer management. This study examines seven representative EPC projects where BIM technology was implemented and it considers various factors that have the potential to influence project decision‐making while taking into account time and cost considerations. A comprehensive multidimensional evaluation method that combines the analytic hierarchy process (AHP) and the fuzzy comprehensive evaluation method is introduced in this study. The results of this study emphasize that the efficiency enhancement strategies derived from the judgment indicator method demonstrate favorable practical outcomes. This research highlights the importance of a comprehensive evaluation method combining the AHP and the fuzzy comprehensive evaluation method to enhance decision‐making efficiency for construction developer management staff.