Ray Rui

Ray Rui

Auto-generated profile, based on publicly available information

Ray Rui

China University of Petroleum, Beijing

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 September 2018 in Geofluids
Verified
Journal Article
Open access
PDF file
YLYuwei Li
Yuwei Li
WMWannong Meng
Wannong Meng
RRRay Rui
Ray Rui
JWJinghui Wang
Jinghui Wang
DJDan Jia
Dan Jia
ADAbhijit Dandekar
Abhijit Dandekar
An accurate evaluation of coal rock fracture conductivity is an important prerequisite for predicting the productivity of CBM wells. Coal rock is soft and fragile, with low elastic modulus and high Poisson ratio. In the process of fracturing flowback, the contact deformation between proppant and fracture wall will affect the fracture conductivity when the proppant is embedded in the coal rock; thus the calculation method of plate fracture conductivity is no longer suitable for the evaluation of coal rock. Based on the contact deformation theory of elastic mechanics, a method for calculating contact deformation of proppant in fracture is proposed. Considering the effect of the deformation and embedded depth of proppant and the tortuosity of pore flow channel between proppant particles on fracture conductivity, a model for calculating fracture conductivity of coal rock fractures under three kinds of proppant arrangement (Model 4-1, Model 3-1, and Model 2-1) is established. Comparison of calculation results of theoretical model and experiments confirmed that the arrangement of proppant in coal rock fracture is closest to Model 3-1, and the influence of mechanical parameters of coal rock and proppant on fracture conductivity is calculated and analyzed by this theoretical model. The study shows that the coal rock fracture conductivity is affected little by Poisson’s ratio of coal rock and proppant, which is greatly influenced by the elastic modulus of them, and the effect of particle size of proppant is especially significant.

15 March 2022
Verified
Conference Paper
Closed access
PDF file
ZZZhiyong Zhu
Zhiyong Zhu
GHGuoqing Han
Guoqing Han
RRRay Rui
Ray Rui
HZHe Zhang
He Zhang
XWXiaodong Wu
Xiaodong Wu
DWDong Xiao Wu
Dong Xiao Wu
Nitrogen (N2) injection-assisted flowback with coiled tubing (CT), CT flowback for short, is more and more widely used due to its convenience in implementation and flexibility in control. The unique feature of gas injection with CT is that the injection depth can be changed continuously (Zhou et al., 2011), which makes flowback become a more complex dynamic process. However, scarce research has been done on such a dynamic process, especially in the optimization of operation parameters such as CT running into hole (RIH) speed and N2 injection rate. In this paper, a numerical model is established using a transient multiple flow simulator to reproduce the dynamic process of CT flowback. On this basis, the characteristics of CT gas injection are explored by comparing fixed-point gas injection with variation-depth gas injection. The influence of formation flowback capacity, CT RIH speed and N2 injection rate on CT flowback process is analyzed. And finally the optimization suggestions of CT operating parameters are put forward. The simulation results show that, compared with fixed-point gas injection, variation-depth gas injection (i.e. CT gas injection) can achieve a more controlled flowback, significantly reduce the gas injection pressure, and realize the gentle unloading of bottom hole pressure. Formation flowback capacity has an important effect on the CT flowback process, different formation flowback capacities result in different gas well unloading degrees, with the increase of formation flowback capacity, the unloading degree of gas well decreases. CT RIH speed can to a large extent control wellbore unloading rate, i.e. the flowback intensity. The increase in RIH speed is at the expense of the increase in gas injection pressure and will lead to a more aggressive bottom hole pressure unloading. So in determining the RIH speed, both surface gas injection facility limitations and downhole pressure control requirements need to be taken into account. For a given CT RIH speed, there is a minimum N2 injection rate, which is required to achieve the continuous drainage, i.e., the lower limit for N2 injection rate. On the basis of this, further increasing the N2 injection rate will accelerate the wellbore unloading, and reduce the peak of gas injection pressure, but there is also an upper limit for N2 injection rate beyond which the benefits are no longer apparent.