Alisha Kasam

Alisha Kasam

Auto-generated profile, based on publicly available information

Alisha Kasam

Argonne National Laboratory, Nuclear Science & Engineering Division, Lemont, Illinois 60439

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2019 in Annals of Nuclear Energy
Verified
Journal Article
Closed access
AKAlisha Kasam
Alisha Kasam
JLJeong Ik Lee
Jeong Ik Lee
ESEugene Shwageraus
Eugene Shwageraus

1 April 2020 in Nuclear Engineering and Design
Verified
Journal Article
Closed access
AKAlisha Kasam
Alisha Kasam
JLJeong Ik Lee
Jeong Ik Lee
ESEugene Shwageraus
Eugene Shwageraus

1 February 2021 in Nuclear Engineering and Design
Verified
Journal Article
Closed access
AKAlisha Kasam
Alisha Kasam
ESEugene Shwageraus
Eugene Shwageraus

21 March 2022 in Nuclear Science and Engineering
Verified
Journal Article
Open access
AKAlisha Kasam-Griffith
Alisha Kasam-Griffith
MAMilos Atz
Milos Atz
TFTingzhou Fei
Tingzhou Fei
ZZZhaopeng Zhong
Zhaopeng Zhong
MJMichael Jarrett
Michael Jarrett
FHFlorent Heidet
Florent Heidet
Successful operation of the Versatile Test Reactor (VTR) relies on satisfying stakeholder requirements and guaranteeing customer timelines. Although the VTR leverages proven sodium fast reactor technology, its mission as a test reactor introduces unique design and operational requirements. This paper covers the preliminary analysis and methodology development for two areas of the VTR core design related to the operational flexibility necessary for the testing mission. The first of these introduces a framework for assessing the feasibility of storing used driver fuel in the VTR shield region, which offers potential benefits to operations but may affect core reactivity and increased cooling time. A methodology to assess these impacts using neutronics and depletion calculations is demonstrated on three in-shield storage configurations. The second focus area highlights operational considerations and maximum residence time of the VTR control assemblies, which are critical to maintaining the irradiation environment necessary to deliver on the VTR mission. A preliminary methodology that assesses B-10 depletion and absorber rod swelling is demonstrated with the goal of informing future development. Together, these research activities illustrate how the early-stage VTR design is guided by anticipation of operating objectives.