Kader Sanogo

Kader Sanogo

Auto-generated profile, based on publicly available information

Kader Sanogo

CESI LINEACT, EA 7527, Angoulême Campus, La Couronne, France

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2023 in Journal of Manufacturing Systems
Verified
Journal Article
Closed access
KSKader Sanogo
Kader Sanogo
ABAbdelkader Mekhalef Benhafssa
Abdelkader Mekhalef Benhafssa
MSM’hAmmed Sahnoun
M’hAmmed Sahnoun
BBBelgacem Bettayeb
Belgacem Bettayeb
MAMoussa Abderrahim
Moussa Abderrahim
ABAbdelghani Bekrar
Abdelghani Bekrar

28 December 2024 in Simulation Modelling Practice and Theory
Verified
Journal Article
Closed access
KSKader Sanogo
Kader Sanogo
ABAbdelkader Mekhalef Benhafssa
Abdelkader Mekhalef Benhafssa
MSM’hammed Sahnoun
M’hammed Sahnoun

17 July 2025 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
KSKader Sanogo
Kader Sanogo
ABAbdelkader Mekhalef Benhafssa
Abdelkader Mekhalef Benhafssa
MSM’hammed Sahnoun
M’hammed Sahnoun

11 November 2024 in SIMULATION
Verified
Journal Article
Closed access
KSKader Sanogo
Kader Sanogo
ABAbdelkader Mekhalef Benhafssa
Abdelkader Mekhalef Benhafssa
MSM’hAmmed Sahnoun
M’hAmmed Sahnoun
Optimizing job shop scheduling in modern factories demands flexibility and adaptability to handle unexpected events and Unmanned Ground Vehicles (UGVs) limitations. This paper addresses these challenges by introducing a novel multi-agent simulator for the Job Shop Scheduling Problem (JSSP) with UGVs handling transportation tasks. The simulator, designed with Netlogo, incorporates real-world constraints, such as collision avoidance, UGV fleet size, and battery limitations, often overlooked in prior studies. By comparing the two categories of UGVs, namely, Autonomous Guided Vehicles (AGVs) and Autonomous Intelligent Vehicles (AIVs), under different scheduling methods (static vs dynamic), we evaluate their performance in constrained manufacturing environments. Our findings highlight the superior performance of AIVs in terms of overall makespan and resilience to additional constraints. Among other results, we found that schedules with a fleet of 2 AIVs produced similar makespans than schedules with a fleet of 4 AGVs. Consequently, the simulator and the conducted study provide valuable insights for optimizing JSSP within constrained environments and making informed decisions regarding AIVs adoption.

3 June 2022
Verified
Book Chapter
Closed access
PDF file
KSKader Sanogo
Kader Sanogo
ABAbdelkader Mekhalef Benhafssa
Abdelkader Mekhalef Benhafssa
MSM’hAmmed Sahnoun
M’hAmmed Sahnoun
BBBelgacem Bettayeb
Belgacem Bettayeb
ABAbdelghani Bekrar
Abdelghani Bekrar