José Isaac Ramírez-Macías

José Isaac Ramírez-Macías

Auto-generated profile, based on publicly available information

José Isaac Ramírez-Macías

Argo Consultores Ambientales , Veracruz

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 May 2019 in Latin American Journal of Aquatic Research
Verified
Journal Article
Open access
PDF file
FCFrancisco Liano Carrera
Francisco Liano Carrera
TLTomas Camarena Luhrs
Tomas Camarena Luhrs
ABArturo Gomez Barrero
Arturo Gomez Barrero
FFFrancisco Martos Fernandez
Francisco Martos Fernandez
JMJose Ramirez Macias
Jose Ramirez Macias
DMDavid Salas Monreal
David Salas Monreal
New coral reef structures in a tropical coral reef system

11 July 2024 in Ocean Engineering
Verified
Journal Article
Open access
Mauro Cortez-HuertaMauro Cortez-Huerta
Mauro Cortez-Huerta
RERodolfo Sosa Echeverría
Rodolfo Sosa Echeverría
GGGilberto Fuentes García
Gilberto Fuentes García
RDRafael Esteban Antonio Durán
Rafael Esteban Antonio Durán
JRJosé Isaac Ramírez-Macías
José Isaac Ramírez-Macías
JKJonathan Dw. Kahl
Jonathan Dw. Kahl

16 January 2026 in Integrated Environmental Assessment and Management
Verified
Journal Article
Closed access
JRJenner Rodas-Trejo
Jenner Rodas-Trejo
JMJosé I Ramírez Macías
José I Ramírez Macías
HGHéctor H Barradas García
Héctor H Barradas García
RGRoberto A Rivera Guzmán
Roberto A Rivera Guzmán
This study documented short-term spatial patterns of the neotropical river otter (Lontra longicaudis annectens) during hydroelectric dam construction in the Grijalva River, Chiapas, Mexico. Weekly systematic surveys were conducted in two zones during 2023–2024 (104 surveys per zone): a construction-Disturbed Zone and a less altered Riparian Zone. Methodological constraints—including absence of preconstruction baselines and a disturbance-gradient rather than control-impact design—limit causal inferences; findings represent preliminary observations temporally correlated with construction activities. Habitat use indices were higher in the Disturbed Zone (0.76 records/km) than the Riparian Zone (0.54 records/km). However, spatial analyses (Kernel density, Getis-Ord Gi*, Ripley’s K function) revealed a 2.14 km southeast shift in activity hotspots toward the Riparian Zone during 2024, consistent with potential displacement patterns as construction intensified. Results provide preliminary insights for hydroelectric project management, emphasizing the need for robust preconstruction baseline monitoring and connected riparian corridors to facilitate species movement.