Charles Hirlimann

Charles Hirlimann

Auto-generated profile, based on publicly available information

Charles Hirlimann

Institut de Physique et Chimie des Matériaux de Strasbourg (IPCMS) UMR 7504 CNRS – Université de Strasbourg 23 rue du Lœss BP 43, 67034 Strasbourg cedex 2 France

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 July 2018 in ChemCatChem
Verified
Journal Article
Closed access
PDF file
KDKassiogé Dembélé
Kassiogé Dembélé
MBMounib Bahri
Mounib Bahri
GMGeorgian Melinte
Georgian Melinte
CHCharles Hirlimann
Charles Hirlimann
ABAdrien Berliet
Adrien Berliet
Ovidiu ErsenOvidiu Ersen
Ovidiu Ersen

6 July 2018 in Nanoscale
Verified
Journal Article
Closed access
PDF file
MBM. Bahri
M. Bahri
KDKassiogé Dembélé
Kassiogé Dembélé
CSC. Sassoye
C. Sassoye
Damien DebeckerDamien Debecker
Damien Debecker
SMS. Moldovan
S. Moldovan
Ovidiu ErsenOvidiu Ersen
Ovidiu Ersen
We report on the in situ analysis of the growth process of carbon nanostructures catalyzed by Ru nanoparticles using syngas, a mixture of hydrogen and CO, as the carbon source at a medium temperature (500 °C). The structural modifications of the dual nanotube/nanoparticle system and the general dynamics of the involved processes have been directly followed during the growth, in real time and at the atomic scale, by transmission electron microscopy in an environmental gas cell at atmospheric pressure. After a reduction step under hydrogen and syngas, the particles became very active for the carbon growth. The growth rate is independent of the particle size which mainly influences the nanotube wall thickness. Other subtle information on the general behavior of the system has been obtained, as for instance the fact that the regular changes in the direction of the particle originate generally from the particle shape fluctuation. The main result is the evidence of a new growth mode in relation to the presence and the high instability of the ruthenium carbide phase which acts as a carbon reservoir. For the first time, a relaxation oscillation of the growth rate has been observed and correlated with the metal–carbide structural transition at the particle sub-surface.

4 October 2018 in Nanoscale
Verified
Journal Article
Closed access
PDF file
WBWalid Baaziz
Walid Baaziz
MBMounib Bahri
Mounib Bahri
AGAnne Sophie Gay
Anne Sophie Gay
ACAlexandra Chaumonnot
Alexandra Chaumonnot
DUDenis Uzio
Denis Uzio
Ovidiu ErsenOvidiu Ersen
Ovidiu Ersen
The thermal stability of core–shell Pd@SiO2 was for the first time monitored by using in situ Environmental TEM at atmospheric pressure coupled with Electron Tomography on the same particles.

19 November 2020 in ChemCatChem
Verified
Journal Article
Closed access
PDF file
KDKassiogé Dembélé
Kassiogé Dembélé
MBMounib Bahri
Mounib Bahri
CHCharles Hirlimann
Charles Hirlimann
SMSimona Maria Moldovan
Simona Maria Moldovan
ABAdrien Berliet
Adrien Berliet
Ovidiu ErsenOvidiu Ersen
Ovidiu Ersen

4 February 2022 in Nanoscale Advances
Verified
Journal Article
Open access
PDF file
ODOthmane Darouich
Othmane Darouich
WBWalid Baaziz
Walid Baaziz
DIDris Ihiawakrim
Dris Ihiawakrim
CHCharles Hirlimann
Charles Hirlimann
DSDanièle Spehner
Danièle Spehner
Ovidiu ErsenOvidiu Ersen
Ovidiu Ersen
A multiscale 3D approach combining three advanced volumetric imaging techniques was employed for obtaining direct information on the hierarchical porosity in Coscinodiscus sp. diatoms having an internal organization ranging from micrometer to nanometer.

8 February 2022 in arXiv
Verified
Preprint
Open access
PDF file
CHCharles Hirlimann
Charles Hirlimann
The calculation of the energy required to raise a constituent block of the Khufu pyramid and the knowledge of the mechanical energy that a worker in charge of the lifting of the blocks can produce per working day allows an estimate of the minimum number of workers. necessary for the establishment of a base of the pyramid. It emerges that this number is limited to a maximum of less than 2,000 workers over a working season, ie less than 200 present each day simultaneously on the site. In addition, the calculation of the flow of blocks leads to the ineluctable conclusion that the construction could only be done in a massively parallel working mode, undermining the hypothesis very often put forward of the use of ramps to convey the blocks to their final destination.