Brandon Davis

Brandon Davis

Auto-generated profile, based on publicly available information

Brandon Davis

Attorney at Law, Nossaman LLP, 777 South Figueroa St., 34th Floor, Los Angeles, CA 90017. ORCID:

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2019 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Verified
Journal Article
Closed access
Ghada M. GadGhada M. Gad
Ghada M. Gad
BDBrandon Davis
Brandon Davis
Pramen ShresthaPramen Shrestha
Pramen Shrestha
PHPatrick Harder
Patrick Harder
Over the last decade, with legislation changes and increased project complexity, some airports started using progressive design-build (DB) project delivery, a variation of the traditional DB model. This is because it allows owners to hire a designer-builder without a price commitment until reasonable design details are defined. This paper, thus, aims at investigating and presenting lessons learned in planning, procurement, contract formation, and management of progressive DB. The methodology incorporated a comprehensive literature review of major procurement, contractual, and legal issues pertinent to delivering airport projects using progressive DB. Ten overarching aspects were identified and were further investigated on a California terminal expansion project case study, encompassing two progressive DB contracts. Results show that owners select progressive DB for schedule compression and delayed locking of contract price reasons. Lessons learned encompassed moving project handover responsibility to the designer-builder, closely tracking and participating in the design development process, and vigilantly handling cost-saving provisions so as not to jeopardize project quality.

1 August 2020 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Verified
Journal Article
Closed access
Pramen ShresthaPramen Shrestha
Pramen Shrestha
BDBrandon Davis
Brandon Davis
Ghada M. GadGhada M. Gad
Ghada M. Gad
The use of alternative project delivery methods has increased significantly in the last decade. In the past, airport projects were designed and constructed using the traditional design-bid-build delivery method. However, recently airport owners have been extensively using construction-manager-at-risk (CMAR), lump-sum design-build, and progressive design-build to build both landside and airside projects. As new project delivery methods are used, airports have learned lessons related to legal and contractual issues in these types of projects. The objective of this paper is to investigate and highlight legal issues that arise in medium to large CMAR airport projects during design, construction, and closeout phases. The study covers legal issues related to design, environmental permitting, contract procurement and management, construction phasing, insurance requirements, local issues and outreach, dispute resolution methods, funding, hazardous material remediation, incentives and disincentives, project closeout, and operation and maintenance of these airport projects. To achieve the objective of this study, the paper utilized a case study methodology by gathering and analyzing contract documents from airport CMAR projects, as well as interviewing the project managers and construction lawyers working on these projects. Some of the lessons learned using the CMAR method were to ensure that the Federal Aviation Authority (FAA) and local laws allow for the procurement of these types of projects, as well as understanding the fact that design and construction management in these types of projects vastly differ from the traditional method. Other lessons learned, related to insurance, environmental permitting, dispute resolutions, and project labor agreements are discussed. Recommendations stemming from these findings are also highlighted, so airport owners will be aware of legal issues that can potentially arise on airport CMAR projects.

1 February 2020 in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Verified
Journal Article
Closed access
Ghada M. GadGhada M. Gad
Ghada M. Gad
BDBrandon Davis
Brandon Davis
Pramen ShresthaPramen Shrestha
Pramen Shrestha
MFMedya Fathi
Medya Fathi
Changes in legislation and increases in the complexity of airport projects have led owners to expand the use of alternative project delivery methods, such as the lump-sum design-build (DB) method. The objective of this study was to investigate and present lessons learned from the use of lump-sum DB on large-scale airport projects during planning, procurement, closeout, and operations. To achieve this objective, a literature review was conducted in order to examine primary procurement, contractual, and legal issues pertinent to lump-sum DB in airport projects. A case study of a lump-sum DB central utility plant project is presented, which included construction of new maintenance facilities, replacement and construction of new piping for utility distribution, and electrical and communication systems. The lessons learned from the case study include the importance of maintaining an adequate management involvement level, which can help the design-builder avoid project delays but still protects the owner from design liabilities. Another key lesson learned is the provision of adequate training to management and staff in procurement and management of lump-sum DB projects in order to avoid potential claims. The study’s main contribution is in shedding light on the use of lump-sum DB by addressing untapped legal and contractual issues associated with large-scale airport capital programs.