YiFan Gu

YiFan Gu

Auto-generated profile, based on publicly available information

YiFan Gu

Jiangnan University

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 April 2024
Verified
Conference Paper
Open access
RLRui Li
Rui Li
HXHua Xu
Hua Xu
YGYiFan Gu
YiFan Gu
JYJinfeng Yang
Jinfeng Yang
This paper introduces an adaptive multi-objective evolutionary algorithm (MBEA) with a memory mechanism to solve the resolution of the fuzzy flexible job shop scheduling problem. The algorithm aims to minimize both the maximum completion time and energy consumption. In contrast to the conventional polling local search approach, the algorithm employs a technique of dynamically choosing local search strategies. This enhances the overall optimization capacity and quality of solutions, while also reducing the search duration. This work presents a memory-based strategy as a solution to the issue commonly observed in traditional MOEA/D, where potential high-quality solutions are often lost during the iteration process. The proposed strategy aims to store solutions with promising properties, thereby enhancing the convergence speed of the algorithm and mitigating the risk of the algorithm getting stuck in local optimization. A comprehensive strategy is proposed that incorporates five initialization rules to ensure the generation of a high-quality initial population. This strategy is further enhanced by implementing an elite archiving strategy to effectively cover the Pareto frontiers. Extensive experimentation was carried out on 23 datasets of varying sizes. The results of the experiments indicate that the enhanced algorithm exhibits notably superior performance compared to the other five widely recognized evolutionary algorithms. This research outcome not only introduces a novel and efficient approach for addressing the fuzzy flexible job shop scheduling issue but also holds significant practical value and provides guidance for scheduling decisions in real-world industrial production scenarios.