Farhad Billimoria

Farhad Billimoria

Auto-generated profile, based on publicly available information

Farhad Billimoria

Energy & Power Group, Department of Engineering Science, University of Oxford, Oxford, U.K.

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2019 in IEEE Power and Energy Magazine
Verified
Journal Article
Closed access
EEErik Ela
Erik Ela
FBFarhad Billimoria
Farhad Billimoria
KRKenneth Ragsdale
Kenneth Ragsdale
SMSai Moorty
Sai Moorty
JOJon O’sUllivan
Jon O’sUllivan
PSPaul Sotkiewicz
Paul Sotkiewicz

3 September 2024 in IEEE Transactions on Energy Markets, Policy and Regulation
Verified
Journal Article
Closed access
OYOgün Yurdakul
Ogün Yurdakul
EEErik Ela
Erik Ela
FBFarhad Billimoria
Farhad Billimoria
Flexible ramping products (FRPs) emerge as a promising instrument for addressing steep and uncertain ramping needs through market mechanisms. Initial implementations of FRPs in North American electricity markets, however, revealed several shortcomings in existing FRP designs. In many instances, FRP prices failed to signal the true value of ramping capacity, most notably evident in zero FRP prices observed in a myriad of periods during which the system was in acute need for rampable capacity. These periods were marked by scheduled but undeliverable FRPs, often calling for operator out-of-market actions. On top of that, the methods used for procuring FRPs have been primarily rule-based, lacking explicit economic underpinnings. In this paper, we put forth an alternative framework for FRP procurement, which seeks to set FRP requirements and schedule FRP awards such that the expected system operation cost is minimized. Using real-world data from U.S. ISOs, we showcase the relative merits of the framework in (i) reducing the total system operation cost, (ii) improving price formation, (iii) enhancing the the deliverability of FRP awards, and (iv) reducing the need for out-of-market actions.

4 August 2023 in IEEE Transactions on Energy Markets, Policy and Regulation
Verified
Journal Article
Closed access
FBFarhad Billimoria
Farhad Billimoria
Filiberto FeleFiliberto Fele
Filiberto Fele
ISIacopo Savelli
Iacopo Savelli
TMThomas Morstyn
Thomas Morstyn
Malcolm McCullochMalcolm McCulloch
Malcolm McCulloch
Extreme events, exacerbated by climate change, pose significant risks to the energy system and its consumers. However there are natural limits to the degree of protection that can be delivered from a centralised market architecture. Distributed energy resources provide resilience to the energy system, but their value remains inadequately recognized by regulatory frameworks. We propose an insurance framework to align residual outage risk exposure with locational incentives for distributed investment. We demonstrate that leveraging this framework in large-scale electricity systems could improve consumer welfare outcomes in the face of growing risks from extreme events via investment in distributed energy.