Yunfan Zhang

Yunfan Zhang

Auto-generated profile, based on publicly available information

Yunfan Zhang

Department of Electrical Engineering, State Key Laboratory of Power Systems, Tsinghua University, Beijing, China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 August 2021 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
YZYunfan Zhang
Yunfan Zhang
FLFeng Liu
Feng Liu
ZWZhaojian Wang
Zhaojian Wang
YSYifan Su
Yifan Su
WWWeisheng Wang
Weisheng Wang
SFShuanglei Feng
Shuanglei Feng
Virtual power plant (VPP) provides a flexible solution to distributed energy resources integration by aggregating renewable generation units, conventional power plants, energy storages, and flexible demands. This paper proposes a novel stochastic adaptive robust optimization (SARO) model for determining the optimal self-scheduling plan for VPP’s participation in the day-ahead energy-reserve market. We consider exogenous uncertainties (or called decision-independent uncertainties, DIUs) associated with market clearing prices and available wind generation, as well as endogenous uncertainties (or called decision-dependent uncertainties, DDUs) pertaining to real-time reserve deployment requests. A tractable solution methodology based on modified Benders dual decomposition is developed to effectively solve the proposed SARO model with both DIUs and DDUs. Case studies are conducted to verify the efficiency and applicability of the proposed approach. Comparative results show that the proposed method can mitigate the conservatism of robust strategy by capturing a satisfactory trade-off between profitability and real-time operation feasibility.

8 April 2022 in IEEE/CAA Journal of Automatica Sinica
Verified
Journal Article
Closed access
YZYunfan Zhang
Yunfan Zhang
FLFeng Liu
Feng Liu
YSYifan Su
Yifan Su
YCYue Chen
Yue Chen
ZWZhaojian Wang
Zhaojian Wang
João P. S. CatalãoJoão P. S. Catalão
João P. S. Catalão
In the conventional robust optimization (RO) context, the uncertainty is regarded as residing in a predeter-mined and fixed uncertainty set. In many applications, however, uncertainties are affected by decisions, making the current RO framework inapplicable. This paper investigates a class of two-stage RO problems that involve decision-dependent uncertainties. We introduce a class of polyhedral uncertainty sets whose right-hand-side vector has a dependency on the here-and-now decisions and seek to derive the exact optimal wait-and-see decisions for the second-stage problem. A novel iterative algorithm based on the Benders dual decomposition is proposed where advanced optimality cuts and feasibility cuts are designed to incorporate the uncertainty-decision coupling. The computational tractability, robust feasibility and optimality, and convergence performance of the proposed algorithm are guaranteed with theoretical proof. Four motivating application examples that feature the decision-dependent uncertainties are provided. Finally, the proposed solution methodology is verified by conducting case studies on the pre-disaster highway investment problem.

13 December 2022 in IEEE Transactions on Smart Grid
Verified
Journal Article
Closed access
YSYifan Su
Yifan Su
FLFeng Liu
Feng Liu
ZWZhaojian Wang
Zhaojian Wang
YZYunfan Zhang
Yunfan Zhang
BLBoda Li
Boda Li
YCYue Chen
Yue Chen
Demand response (DR) programs create incentives to effectively exploit the hidden operational flexibility of loads for better supporting power system operations. However, DR programs must consider the increasing demand-side uncertainty due to proliferative devices like electric vehicles and rooftop photovoltaics. Shifting power consumption by DR programs may change the realizations of future uncertainties of loads, leading to decision-dependent uncertainties (DDUs). This paper first proposes a novel multi-stage robust energy and reserve dispatch model with the DR program, where DDUs of deferrable loads and decision-independent uncertainties (DIUs) of curtailable loads are considered simultaneously. Then we develop an improved constraint generation (CG) algorithm with an embedded scenario mapping approach to solve the model effectively. Numerical experiments illustrate the influence of DDUs on the multi-stage robust dispatch problem and verify the effectiveness of the proposed method to cope with DDUs and DIUs in DR programs.

9 June 2023 in IEEE Transactions on Sustainable Energy
Verified
Journal Article
Closed access
YZYunfan Zhang
Yunfan Zhang
SWShiyong Wu
Shiyong Wu
Jin LinJin Lin
Jin Lin
QWQiuwei Wu
Qiuwei Wu
CSChen Shen
Chen Shen
FLFeng Liu
Feng Liu
The proliferation of renewable energy sources (RES) imposes significant challenges on system frequency dynamics. By synthetic inertia and droop control, RES units can provide fast response to sudden frequency events. However, the reserved power and available power of RES units are featured as decision-dependent uncertainties (DDUs), posing challenges to both post-contingency frequency security and system balancing under normal conditions. This article develops a frequency-constrained unit commitment and reserve allocation (FC-UC&RA) model that co-optimizes the reserve allocation and energy dispatch among synchronous generators and RES units. An analytic frequency dynamic model is embedded in the FC-UC&RA problem to accurately assess the system's frequency performance under heterogeneous responses of synchronous and inverter-based units with limited reserve deliveries. To cope with the DDUs stemming from RES generation capabilities scheduled as reserves, a robust FC-UC&RA model is proposed and an adaptive column and constraint generation (C&CG) algorithm is developed to solve the DDU-integrated robust optimization. Comparative case studies verify the effectiveness and applicability of the proposed model and solution approach.

27 January 2021 in IEEE Access
Verified
Journal Article
Open access
YZYunfan Zhang
Yunfan Zhang
YSYifan Su
Yifan Su
ZWZhaojian Wang
Zhaojian Wang
FLFeng Liu
Feng Liu
CLChenghao Li
Chenghao Li
Grid-side electrochemical battery energy storage systems (BESS) have been increasingly deployed as a fast and flexible solution to promoting renewable energy resources penetration. However, high investment cost and revenue risk greatly restrict its grid-scale applications. As one of the key factors that affect investment cost, the cycle life of battery heavily depends on its charging/discharging actions during the operation, particularly in the presence of uncertain renewable generation. In this context, it is necessary to consider the operation-dependent cycle life of batteries in optimal BESS sizing, which imposes great challenges to the modeling and solving of the planning problems. In this paper, we propose a novel two-level optimal sizing model for grid-scale BESS, considering its operation under uncertainties induced by volatile wind generation. In the lower level, a long-term chronological operation simulation of BESS is processed with an accurate cycle life model of batteries; in the upper level, marginal economic utility analysis and BESS size reforming are conducted to approach the optimal size of BESS. An iterative algorithm is designed to solve the model effectively. The proposed method is verified on a modified IEEE RTS-24 system and a real provincial power grid of China.

15 July 2025 in Engineering
Verified
Journal Article
Open access
YZYunfan Zhang
Yunfan Zhang
YSYifan Su
Yifan Su
FLFeng Liu
Feng Liu