Albert Gan

Albert Gan

Auto-generated profile, based on publicly available information

Albert Gan

Department of Civil and Environmental Engineering, Florida International University, 10555 West Flagler Street, EC 3680, Miami, FL 33174, United States

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2015 in Accident Analysis & Prevention
Verified
Journal Article
Closed access
KHKirolos Haleem
Kirolos Haleem
PAPriyanka Alluri
Priyanka Alluri
AGAlbert Gan
Albert Gan

1 June 2015 in Accident Analysis & Prevention
Verified
Journal Article
Closed access
DSDibakar Saha
Dibakar Saha
PAPriyanka Alluri
Priyanka Alluri
AGAlbert Gan
Albert Gan

1 February 2019 in Accident Analysis & Prevention
Verified
Journal Article
Closed access
ARAsif Raihan
Asif Raihan
PAPriyanka Alluri
Priyanka Alluri
WWWu Wensong
Wu Wensong
AGAlbert Gan
Albert Gan

1 June 2015 in Journal of Safety Research
Verified
Journal Article
Closed access
KHKirolos Haleem
Kirolos Haleem
AGAlbert Gan
Albert Gan

1 March 2020 in Accident Analysis & Prevention
Verified
Journal Article
Closed access
DSDibakar Saha
Dibakar Saha
PAPriyanka Alluri
Priyanka Alluri
EDEric Dumbaugh
Eric Dumbaugh
AGAlbert Gan
Albert Gan

1 December 2009 in Journal of Public Transportation
Verified
Journal Article
Open access
PDF file
GZGuangwei Zhou
Guangwei Zhou
AGAlbert Gan
Albert Gan
A queue jumper lane is a special bus preferential treatment that combines a short stretch of a special lane with a transit signal priority (TSP) to allow buses to bypass waiting queues of traffic and then to cut out in front of the queue by getting an early green signal. This paper first proposes a signal control design for queue jumper lanes with actuated TSP strategies and then compares its performance with that of the general actuated mixed-lane TSP. Different design alternatives were evaluated in the VISSIM microscopic simulation. The results show that the proposed TSP with queue jumper lanes can reduce more bus delays than can the commonly-used mixed-lane TSP, especially under high traffic volume conditions. It was also found that a nearside bus stop is superior to the far-side counterpart in terms of both bus delay and overall intersection delay for the proposed design.