Dong Han

Dong Han

Auto-generated profile, based on publicly available information

Dong Han

Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education, Department of Electrical Engineering, Shanghai Jiao Tong University, Shanghai, China

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 May 2017 in Journal of Modern Power Systems and Clean Energy
Verified
Journal Article
Open access
PDF file
YLYiyan Li
Yiyan Li
DHDong Han
Dong Han
ZYZheng Yan
Zheng Yan
In this paper, a data-driven linear clustering (DLC) method is proposed to solve the long-term system load forecasting problem caused by load fluctuation in some developed cities. A large substation load dataset with annual interval is utilized and firstly preprocessed by the proposed linear clustering method to prepare for modelling. Then optimal autoregressive integrated moving average (ARIMA) models are constructed for the sum series of each obtained cluster to forecast their respective future load. Finally, the system load forecasting result is obtained by summing up all the ARIMA forecasts. From error analysis and application results, it is both theoretically and practically proved that the proposed DLC method can reduce random forecasting errors while guaranteeing modelling accuracy, so that a more stable and precise system load forecasting result can be obtained.