Treatment of tunnel wash runoff water and road runoff water before it reaches the environment is recommended to limit the negative consequences of traffic-related pollution. The efficiency of existing water treatment systems to remove traffic-related microplastic (MP) has not been sufficiently documented. Expanding the knowledge about traffic-related MP and documenting the treatment efficiency of MP in road tunnel wash water (TWW) and road runoff (RRW) treatment systems were the objectives of the presented project. TWW from the Tåsen tunnel, Norway, and RRW from the Fossbekken sedimentation pond were investigated in summer and winter situations. Six commonly available polymer types, tire rubber tread particles (TRP), and road marking paints (RMP) were analyzed in the selected samples. About 0.12 and 0.26 μg/L of polymers were identified in winter and summer TWWs. Significantly higher tire rubber and road marking paint concentrations were identified in the winter sample compared to summer sample. Suspended particle concentration in the Fossbekken RRW treatment pond effluent was lower in the summer than in the winter sample. About 0.002 and 0.0008 μg/L polymer masses were identified in winter and summer samples, respectively. TRP in the winter and summer samples were 0.7 and 0.2 μg7/L, and 13.4 μg/L RMP was found in the winter sample, while it was only 0.008 μg/L in the summer sample.
Rapid population growth, industrial development and stringent demand for treatment of wastewater require developing and emerging economies to upgrade existing wastewater treatment plants (WWTP) or planning new WWTPs. In the context of unavailability or unaffordability of land and resources for infrastructure expansion, low cost, small footprint, less energy consumption and product reuse are some of the major factors to be considered when either upgrading or designing new WWTPs in developing and emerging economies. Although the transition from activated sludge to biofilm processes has partly solved these challenges, there are innovations that can make the processes even more compact and more efficient. Newly developed CFIC (Continuous Flow Intermittent Cleaning) process is the next generation moving bed biological wastewater treatment system and is an example for addressing these issues. The CFIC pilot studies showed promising performance for biological COD and nitrogen removal as well as particle separation facilitating wastewater reuse.
A pilot scale CFIC® (Continuous Flow Intermittent Cleaning) reactor was run in anoxic conditions to study denitrification of wastewater. CFIC® process has already proven its capabilities for BOD removal with small footprint, less energy consumption and low cost. Present study focused on the applicability for denitrification. Both pre-denitrification (pre-DN) and post-denitrification (post-DN) were tested. A mixture of primary treated wastewater and nitrified wastewater was used for pre-DN and nitrified wastewater with ethanol as a carbon source was used for post-DN. The pre-DN process was carbon limited and removal rates of only 0.16 to 0.74 g NOx-N/m²-d were obtained. With post-DN and an external carbon source, 0.68 to 2.2 g NO3-Neq/m²-d removal rates were obtained. The carrier bed functioned as a good filter for both the larger particles coming with influent water and the bio-solids produced in the reactor. TSS removal in the reactor varied from 20% to 78% (average 45%) during post-DN testing period and 9% to 70% (average 29%) for pre-DN. The results showed that the forward flow washing improves both the DN function and filtration ability of the reactor.
Continuously flushing moving bed sand filter was operated in pilot scale for phosphorus (P) and nitrogen removal with simultaneous particle removal. The wastewater tested was either final effluent from a municipal wastewater treatment plant (WWTP) with nitrogen removal in moving bed biofilm reactors (MBBRs) followed by coagulation and dissolved air flotation (DAF) for P and suspended solids (SS) removal, or different mixtures of this final effluent and effluent from the MBBR-stage. The study focused on the applicability to achieve low total phosphorus (TP) concentrations (below 0.1 mg/L) and suspended solids concentrations (below 10 mg SS/L), plus good denitrification (removal rate over 750 g NO3-N/m3-d), by treating wastewater having variable concentrations of TP (from 0.19 to 7.3 mg/L), SS (from 3 to 169 mg/L) and total nitrogen (from 8 to 27 mg/L). The target effluent TP limit was easily achieved when adding coagulant to WWTP effluent. With correct coagulant dose (Al/TP-molar ratio >4) and good particle removal the target effluent TP could also be reached when treating mixed WW with fairly high influent TP. Very high denitrification rates were achieved with adequate influent P concentration and external carbon source. Low denitrification rates were observed when limited by low concentrations of biodegradable carbon and phosphorus.
IFAS-MBR with co-precipitation, not yet commonly used in practice, will result in a very compact process for nutrient removal. The process, based on a combined pre- and post-denitrification IFAS process with membrane separation (IFAS-MBR), was tested in two parallel small-scale plants. Train A was operated with co-precipitation in order to achieve high removal of total P (TP). Train B, without co-precipitation, served as a control. Due to the coagulant (Al) addition, the concern was precipitation on the biofilm carriers in the aerobic reactor in Train A. A small internal air-lift pump proved to be very efficient in controlling biofilm thickness and removing excess biofilm mass as needed. A coagulant dose equivalent to an Al/TP molar ratio of 1.9 was necessary to achieve 99% TP removal and 0.10 mg TP/l in the effluent of Train A. Very good removal of total N was achieved in both trains. Train A had a biofilm nitrification rate of 0.65 g NH4-N/m2d at 12–13 °C and 5.2–5.6 mg O2/l. The tests demonstrated that an IFAS-MBR process with co-precipitation and an aerobic suspended biomass SRT of 5–10 days is feasible, and that all the performance goals set up for the full-scale plant were achieved.